My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2023-3503
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2023
>
Reso 2023-3503
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 4:27:52 PM
Creation date
6/13/2023 11:26:32 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2023-3503
Date (mm/dd/yyyy)
05/18/2023
Description
Agreement with Sleiman Construction, LLC for the Meditation Garden located at the Town Center Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />2.2 The Contractor shall perform all the Work required, implied, or reasonably <br />inferable from, this Contract as specifically set forth in the Contract Documents. The <br />Contractor agrees to comply with the City of Sunny Isles Beach's permitting <br />requirements, including all licensing requirements associated with the Public <br />Works Department. <br />2.3 Unless expressly permitted or allowed by the Contract Documents, substitutions <br />of materials, articles, systems, equipment, or other components of the Work will not <br />be considered. Where substitutions are expressly permitted or allowed by the Contract <br />Documents, the Contractor must demonstrate to both the City and the City's <br />Representative that a proposed substitution is equal in substance, quality, and function to <br />the material, article, or piece of equipment identified in the Contract Documents. The City <br />shall have no obligation to accept a proposed substitution and no substitution shall be allowed <br />without the prior written approval from both the City's Representative and the City. If the <br />substitution results in a savings to the Contractor, the City shall be entitled to a credit for the <br />amount saved as a result of the substitution. <br />2.4 The Contractor acknowledges and agrees that the term "flowable fill," included <br />in Contract Documents as a specific unit price, includes removal and disposal of unsuitable <br />spoil material and is subject to the City's approval before including flowable fill into the <br />Work. <br />ARTICLE Ill <br />CONTRACT TIME <br />3.1 Time <br />3.1.1 The City shall notify the Contractor in writing of the date on which the Work <br />shall begin ("the Notice to Proceed Date"). The Contractor shall commence site activities <br />on the Notice to Proceed Date, and the Work shall be carried on regularly and without <br />interruption. The project shall be substantially completed within one -hundred and eighty <br />(180) calendar days from the Project initiation specified in the Notice to Proceed and final <br />completion within two -hundred and ten (210) calendar days from Project date specified in <br />the Notice to Proceed. The total two hundred and ten (2 10) calendar days include weekend <br />days and holidays. <br />3.2 Notice to Proceed <br />3.2.1 Once a Notice to Proceed has been issued, the Contractor shall be responsible <br />for the timely and successful completion of the Work and shall endeavor to provide all <br />applicable agencies having jurisdiction with all the required documentation needed to <br />successfully and timely continue the progress of the Work. This may include, but is not <br />limited to providing all necessary documentation in the form of shop drawings, <br />clarifications, calculations, technical data, protocols, product approvals, etc. <br />3.2.2 Under no circumstances will the City accept claims or be responsible for delays <br />arising from failed, unsuccessful, untimely, or late inspections, or rejections of inspected <br />Work due to the fault of the Contractor for not supplying all of the necessary documentation <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.