My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2023-3504
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2023
>
Reso 2023-3504
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2023 4:00:33 PM
Creation date
6/13/2023 11:31:39 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2023-3504
Date (mm/dd/yyyy)
05/18/2023
Description
Agreememt with The Stout Group, Inc, for construction services at East End of 172nd Street Roadway & Drainage Improvement Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />5.2 Payment Procedure <br />5.2.1 The City shall pay the Contract Price to the Contractor as provided below. <br />5.2.2 Progress Payments. Based upon the Contractor's Payment Requests to the <br />City's Representative and upon Certificates forPayment subsequently issued to the City by <br />the City's Representative, the City shall make progress payments to the Contractor on <br />account of the Contract Price. Contractor shall use the AIA G-702 / 703 payment submittal <br />method. <br />5.2.3 On or before the 25th day of each month after commencement of the Work, <br />the Contractor shall submit a Payment Request for the period ending the last day of the <br />previous month to the City Representative in such form and manner, and with such <br />supporting data and content, as the City or the City Representative may require. <br />Contemporaneously with the submission of each Application for Payment, the Contractor <br />shall submit a current shop drawing log reflecting the status of all shop drawings and <br />submittals; a current CPM schedule as required by Paragraph 7.9 herein below; lien copies <br />of releases from Contractor and releases from subcontractors in favor of Contractor's Surety <br />confirming receipt of funds received ftom the City for the previous payment period; and the <br />Contractor shall have a current set of As -Built drawings maintained on site including bore <br />logs as may be applicable and available for inspection. Submission of the shop -drawing log, <br />CPM schedule, and photographs as required herein shall be a condition precedent for <br />payment to the Contractor. With regard to any Contract for construction services, a public <br />entity may withhold from each progress payment made to the Contractor an amount not <br />exceeding 5 percent of the payment as retainage. Payment for stored materials and <br />equipment shall be contingent upon the Contractor's proof satisfactory to the City, that the <br />City has title to such materials and equipment and shall include proof of required insurance <br />sufficient to protect the City from any loss should the materials and equipment be lost, stolen <br />or otherwise destroyed or damaged. <br />Such Payment Request shall be signed by the Contractor and shall constitute the Contractor's <br />representation that the Work has progressed to the level for which payment is requested in <br />accordance with the Schedule of Values, that the Work has been properly installed or <br />performed in full accordance with this Contract, and that the Contractor knows of no reason <br />why payment should not be made as requested. Thereafter, the City's Representative will <br />review the Payment Request and may also review the Work at the Project site or elsewhere <br />to determine whether the quantity and quality of the Work is as represented in the Payment <br />Request and is as required by this Contract. The City, in its sole discretion, may review the <br />Work and the Payment Request prior to any certification by the City's Representative and <br />the City may, in its sole discretion, require the City's Representative and the Contractor to <br />meet and confer with the City with respect to said Payment Request prior to any certification <br />of same. The City's Representative shall determine and certify the City the amount properly <br />owing to the Contractor. The City shall make partial payments on account of the Contract <br />Price to the Contractor within twenty-five (25) days following the receipt of the City's <br />Representative's approval of each Payment Request. <br />The amount of each partial payment shall be the amount certified for payment by the City's <br />Representative less such amounts, if any, otherwise owing by the Contractor to the City or <br />
The URL can be used to link to this page
Your browser does not support the video tag.