My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2023-3504
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2023
>
Reso 2023-3504
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2023 4:00:33 PM
Creation date
6/13/2023 11:31:39 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2023-3504
Date (mm/dd/yyyy)
05/18/2023
Description
Agreememt with The Stout Group, Inc, for construction services at East End of 172nd Street Roadway & Drainage Improvement Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny .Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />3.3.1 All limitations of time set forth in the Contract Documents are of the essence <br />of this Contract. <br />3.4 The Terms of Sections 1.8, 7.15, and 7.5 entitled "Compliance with Laws", <br />"Indemnity" and "Warranty", respectively, shall survive the expiration or termination of this <br />Agreement. <br />ARTICLE IV <br />CONTRACT PRICE <br />4.1 The Contract Price <br />4.1.1 The City shall pay, and the Contractor shall accept, as full and complete <br />payment for all of the Work required herein, the fixed sum of Three Hundred Eighty -Four <br />Thousand Two Hundred Forty -One Dollars and No Cents ($384,241.00). The fixed sum set <br />forth in this Paragraph 4. 1.1 shall constitute the Contract Price which shall not be modified <br />except by Change Order as provided in this Contract. <br />4.2. Contingency <br />4.2.1 In addition to the Contract Price set forth in Paragraph 4.1.1, there shall be a <br />contingency in the amount of Thirty -Eight Thousand Four Hundred Twenty -Four Dollars and <br />Ten Cents ($38,424.10). The contingency accounts for all labor, materials, equipment, <br />overhead, and services necessary for modification or extra work required to complete the Work <br />because of unforeseen conditions, unforeseen conflicts between existing elements of work and <br />the proposed work; for minor changes required to resolve any unforeseen conditions, Revised <br />Regulations, Technological and Products Development, Operational Changes, Schedule <br />Requirements, Program Interface, Emergencies, and Other Miscellaneous Costs, and for <br />adjustments to estimated quantities installed, and associated time related to the Work. <br />Unforeseen conditions or conflicts as used in this Paragraph 4.2.1, are those conditions which <br />could not have been determined or ascertained from a thorough and careful examination and <br />inspection of the site as provided by Paragraph 1.5.8. The disbursement of all or part of the <br />contingency is entirely at the discretion of the City and must be authorized by the City's <br />Representative and approved by the City. <br />ARTICLE V <br />PAYMENT OF THE CONTRACT PRICE <br />5.1 Schedule of Values <br />5.1.1 At least seven (7) days before the first Pre -Construction Meeting, the Contractor <br />shall submit to the City and to the City's Representative a Schedule of Values allocating the <br />Contract Price to the various portions of the Work in conformance to the revised bid form <br />submitted by Contractor in response to the ITB. The Schedule of Values shall be used only <br />as a basis for the Contractor's Applications for Payment and shall only constitute such basis <br />after it has been acknowledged in writing by the City's Representative and the City. <br />
The URL can be used to link to this page
Your browser does not support the video tag.