Reso 2023-3505
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2023
>
Reso 2023-3505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2023 4:01:33 PM
Creation date
6/13/2023 11:38:20 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2023-3505
Date (mm/dd/yyyy)
05/18/2023
Description
Change Order #6 to Agreement with The Stout Group, Inc. for construction of Golden Shores Utility Undergrounding Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sv N <br />�tf <br />y�iyy�* FLo��pPy�r <br />C,Tr OF SUN PCO <br />CITY OF <br />SUNNY ISLES BEACH <br />CONTRACT <br />Change Order <br />Change Order Number: 6 <br />DATE: March 21,2023 <br />ITB NUMBER: 21-08-01 <br />PROJECT: <br />Utility Undergrounding <br />For <br />Golden Shores <br />RESOLUTION NUMBER: 2021-3279 <br />$7,538,432.01 <br />ORIGINAL DOLLAR CONTRACT AMOUNT: <br />$5,858,477.58 <br />NET TOTAL DOLLAR VALUE OF ALL PREVIOUS CHANGE ORDERS: <br />$1,679,954.43 <br />CONTRACT AMOUNT PRIOR TO THIS CHANGE ORDER: <br />$7,538,432.01 <br />DOLLAR AMOUNT OF THIS CHANGE ORDER: <br />$426,783.00 <br />NEW DOLLAR CONTRACT AMOUNT: <br />$7,965,215.01 <br />ORIGINAL CONTRACT COMPLETION DATE <br />July 19,2023 <br />TOTAL OF PREVIOUS CHANGE ORDER DAYS: <br />0 <br />AMOUNT OF DAYS PER THIS CHANGE ORDER: <br />0 <br />NEW CONTRACT COMPLETION DATE: <br />July 19,2023 <br />DESCRIPTION OF SCOPE OR WORK CHANGES: <br />Atlantic Broadband (Breezeline) conduit adjustments required due to coordination issues relating to Phase 4 Collins Ave. <br />undergrounding project, additional MOT required due to additional conduit scope, FPL additional conduit required for <br />Feeder and Primary service connections, existing asphalt depths exceed previous projections, continuing unforeseen <br />conditions with obstructions and unknown existing utilities <br />NOTE: Unless specifically stated clearly elsewhere on this page, this contract amendment does NOT include an <br />extension of time or grant any additional general conditions amounts. The City and the Contractor agree that the <br />contract time adjustment and sum agreed to in this document constitute a full and complete settlement of the <br />matters set forth herein, including all direct and indirect costs for equipment, manpower, materials, overhead, profit <br />and delay relating to the issues set forth in this document. <br />CONTRACTOR`� <br />The Stout Group <br />Valerie Vicente <br />CITY ATTORNEY: <br />HPF Associates, Inch <br />PROJECT MANAGER: <br />. <br />City of Sunny Isles Beach <br />(Gtr <br />CITY MANAGER: <br />Stan Morris <br />
The URL can be used to link to this page
Your browser does not support the video tag.