Laserfiche WebLink
thickness. Ongoing excavation activities have found the vast majority of the roadway to consist of a <br />minimum of 8" to a maximum of 14" of asphaltic concrete paving. The additional material removal and <br />disposal is being charged at the contractual unit price per cubic foot of volume, the previous estimate <br />projections for this item will be exceeded due to ongoing field conditions. <br />ATTACHMENTS: <br />Resolution <br />Change Order No. 6 <br />Item Number: 10.F <br />