Laserfiche WebLink
I Il <br />uN <br />� l <br />u <br />6�I1100 : <br />RESUMES LOUIS J. AGUIRRE & ASSOCIATES <br />Mr. Sergio R. Serrano, P.E. has been a mechanical engineer since 1992 and has since acquired <br />an Immense amount of experience in his respective discipline. He has been involved in all <br />phases of the design and construction process. Ai an Associate /Project Manager for Lows J. <br />Aguirre 8 Associates, PA., Mr. Serrano is responsible for client relations, management and <br />roadwtion, site /facdhy analysis, researching and knplementing the most beneficial <br />Meianical Design Concepts, project design, contract administration and observation of <br />systems' installation, testing and perfoma race for major projects. <br />Mr. Serrano has developed his design and project management skills related to educational, <br />commercial and airport facilities. He has performed and supervised Mechanical system <br />assessments for condition, code compliance, problem solving and upgrade. He has also <br />performed plan reviews and prepared Design Criteria Documents. Mr. Serrano was Project <br />Manager and Mechanical Engineer towards the $74 Million dollar parsing garage project that <br />also provided an additional 60,000 sf of retail spaces to serve the much awaited Florida Marlins' <br />new ballpark sodium that brought excitement to MiamirDade and Broward Counties. <br />He 6 the Project Manager and Mechanical Engineer involvetl with the master planning and <br />implementation to the Miami Senior High Restoration, Renovators. Rertodeeng and New <br />Addition Project that invoked maintaining the school's historical features and bee inty while <br />accentuating new more technically advanced characteristics to the school's surface and <br />standards for modem use. It encompassed a 150,000 sf of new, co struction & 252,000 sf of <br />rehabilitation while bringing the school up to codes and so lards. The scoots face IEt and <br />rehab8iution occurred while the school remained open throughout the various phases and <br />processes. Additionally, Mr. Serrano was the project manager Hat provided all lye Mechanical <br />(WAC) portions of the master planning documentation and obsemtions of the various <br />campuses and centers for Broward College. He has full comprehension and understanding of <br />the, State Requirements for Educational Facilities ISREFI, Chapter 235 Florida Statutes, Florida <br />Budding Codes and Public Approvals. <br />REPRESENTATIVE PROJECTS <br />• Miami Dade College, Hialeah Campus, Rerovatiorss /Remodeling - Hialeah, Honda <br />• Miami Senior High School, Historical Restoration, Renovations, Remodeling and New <br />Addition (includes a 3 -Level secured parking garage) - Miami, FL <br />• New K -8 Schools for MiamFDade County Public Schools Isclsooh include parking lot <br />structure facilities serving staff, students and parents, LEED Pnrlciples and Concepts will <br />followed throughout design cievelopmentl- Miami, Florida <br />0 Aventura Waterways K -8 Center IState School D. K -8 Prototype) <br />o Mandarin Ickes K -8 Academy (State Sdod DD-1, K$ Prototype) <br />0 Coconut Palm K 8 Academy (State School CC -1, K -8 Prototype) <br />Arch Creek Elementary School (Sure School E -1, New K -8) <br />• Dr. Rolando Espinosa K-B Center (State School P -1, New K -8) <br />• Homestead Middle School (State School TT -1, New K -8) <br />• Broward College Master Planning, campuses and center buikdings - Broward County, Fl <br />• City of Miami, Marlin's Stadium Parking Garage, 4 Parking Garage Structures, 4 Parsing IM <br />Structures and 60,000 sf. retail support spaces - Miartd, Florida <br />• 396 Alhambra, 15 -stay Mixed Use Development Towers and multi -story Parking garage <br />(FEED Gold and Sliver implementation in process) - Coral Gables, Florida <br />• Mereac Aifres NUN Terminal Developmen t - Federal (rt Serum Station- 4�pOpsglm <br />het -M®si Maradvul Airport - Mort* Florida <br />• MIA Mover APM System, Fixed Facilities CMrsRuetion Services Cartwltant - Miami, Florida <br />• Bayview Market, Retail Office Spaces and Mufti-levM Parking Gauge - Miami, Florida <br />• YMCA Of Greater Miami, New ABapattah Family Borsch Facility (included an orvsrte parking <br />structure) - Miami, Florida <br />• The Ernerulia[Bridretl ffiSmry Residential N�FRbe(atldel pUling grege fac3ty)- fwtar *R <br />• EFG Capital and S 011 Miami at 701 Brkkell Avenue Interior Reswatiors - Miami, Florida <br />• H4Wurce Signature at 701 Brickell Avenue Interior Rerhwatiom- Miami, Florida <br />• Interratlowl Polo Club, New Ballroom and Stadium Complex - West Patin Beach. Honda <br />• Relief to Highland Oaks Middle School (K-mart store Conversion) - Miami, Florida <br />• City of Miami. At alie Range Park 5wimmirg Pool Improvements - Miami, Florida <br />• Gibraltar Private Bank & Trust <br />o Downtown Headquarters, Office Renovations <br />o Coral Gables Headquarters, Office Renovations <br />0 3'w Floor Renovations, Coral Gables Headquarters <br />0 4'a Floor Renovations, Coral Gables Headquarters <br />Cb- <br />SERGIO R. SERRANO, <br />P.E., LEEDS AP <br />ASSOCIATE <br />MECHANICAL ENGINEER <br />a�11IDGMIC+15 <br />Bachelor of Science <br />N.echon"coi Ersg�neervtg <br />Ursve s:fy of Centro; Florida <br />1492 <br />REGISTRATION <br />Mechomica! Erg.:�er <br />Herido: 57864 <br />AFFILIATIONS /HONORS <br />US. Green Eut''dir, Coun::if <br />LEED (Leadersftip in Energ: <br />and Environmental Deign) <br />Accreciied Prole sfionol <br />Eulding Cod=_ Corrplianc -E <br />(BCC) Irape_ctor/Re-4E,vz <br />ton I A."1i 10 x Xs C AIFi P <br />cocsdw �sEngrnee!s <br />CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07-02 <br />11 <br />