My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bermello Ajamil & Partners, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Bermello Ajamil & Partners, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:23:40 AM
Creation date
8/18/2014 4:33:06 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />• <br />• <br />• <br />• <br />• <br />• <br />s <br />• <br />• <br />• <br />• <br />• <br />• <br />0 <br />• <br />• <br />• <br />0 <br />0 <br />0 <br />0 <br />O <br />• <br />0 <br />• <br />• <br />0 <br />• <br />QUALIFICATIONS <br />EXPERIENCE <br />B.F. James Park This project encompassed the complete redevelopment of an <br />Hallandale Beach, Florida underused existing neighborhood park through extensive public <br />input and master plan development. From the neighborhood <br />meetings, B &A developed an extensive program for the new <br />Client: City of Hallandale Beach park including a new community swimming facility, relocated <br />basketball courts, picnic areas, exercise stations and an <br />expanded playground for a greater range of age groups. In <br />addition, to meet City code requirements, the park and buildings <br />were designed for LEED Certification. B &A managed the LEED <br />Certification and led the design team through the certification <br />process. <br />B &A developed various architectural alternatives for the aquatic <br />swim building. The architectural style of this facility will serve as <br />the bases for the design of all public buildings in future City parks. <br />Although relatively small, the new pool will serve the community's <br />recreational needs and includes a beach entry feature and <br />three lap lanes which can be modified for swim health classes. <br />A new parking lot proposed along the south side of the park <br />was designed to both improve community access and allow for <br />improved visibility into the park for the police department. The <br />park was designed utilizing numerous CPTED principles. <br />CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07 -02 <br />33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.