My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bermello Ajamil & Partners, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Bermello Ajamil & Partners, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:23:40 AM
Creation date
8/18/2014 4:33:06 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O <br />O <br />O <br />O <br />O <br />O <br />O <br />O <br />O <br />O <br />O <br />• <br />B <br />e <br />• <br />B <br />e <br />QUALIFICATIONS <br />SUBCONSULTANTS E SCIENCES <br />City of Miami Beach Environmental Engineering <br />Continuing Services <br />Client City of Miami Beach <br />Project Dales August 2011 - Ongoing <br />County Miami -Dade <br />Description <br />E Sciences was awarded a contract with the City of Miami Beach to conduct environmental engineering <br />services. To date, E Sciences has provided the City with the following services: <br />Spill Prevention Control and Countermeasure (SPCC) Plans — E Sciences prepared SPCC Plans for 12 <br />facilities throughout Miami Beach. These facilities included pump stations, fire stations, public works yard, <br />Miami Beach Golf Club and the Convention Center. E Sciences' approach for performing the SPCC Plans) <br />required under this contract followed the steps outfined in applicable federal regulations (40 CFR 112). We <br />conducted the following activities to obtain the information required to complete the Tier I SPCC Plan: <br />• Review available as -built drawings, surveys and plans related to the structures and drainage <br />pathways <br />• Conduct a site visit of each facility with a person knowledgeable of the facilites tank systems, <br />coordinated through the City's Environmental Department <br />• Interview the site manager or other personnel familiar with the tank systems and other oil storage <br />systems <br />• Review records of previous spills <br />• Evaluate topography and surface water flow regimes <br />• Evaluate areas of obvious discharge potential and spill sources <br />• Identify environmentally sensitive areas and potential receptors if a spill were to occur <br />• Document security measures to prevent unauthorized access to oil handling <br />• Develop a list of emergency response personnel <br />• Review the Citys spill response measures <br />• Review records of tank integrity and pressure tests <br />• Review the C tys personnel training records <br />The above information was used to complete the Tier I SPCC Plan for each facility. The Plan was reviewed <br />and certified by an E Sciences Professional Engineer. We also incorporated recommendations to assist the <br />City with compliance with state regulations. <br />Green Waste Facility — This site is an undeveloped, bermed area located on the east side of the Miami <br />Beach Golf Club. The site was previously used by the City of Miami Beach for solid waste management and <br />a portion of the area contained buried debris. In anticipation of constructing the wastewater reclamation <br />facility, the City implemented a material screening plan to remove the buried solid waste and screen out the <br />larger (greater than 2inches) pieces of solid waste for off -site disposal. The recovered screened material <br />(RSM) was merged with a berm around the solid waste handling area to separate it from adjacent properties <br />and the golf course. The larger pieces of debris removed consisted primarily of rods, concrete and wood <br />debris. Miami -Dade Department of Environmental Resource Management (DERM) (currently Permitting, <br />Environment and Regulatory Affairs - PERA) required the City to demonstrate that there was a minimum of <br />two feet of dean fill or other engineering control in place covering areas of solid waste in or around the berm <br />in order pursue regulatory closure for the site. <br />If _ ee R_' 84 201. <br />I'M -,; r 0ar1 -e0- N& <br />CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07 -02 <br />EEO <br />
The URL can be used to link to this page
Your browser does not support the video tag.