Laserfiche WebLink
e <br />O <br />e <br />O <br />e <br />�1"Mu <br />RESUMES BERMELLO AJAMIL & PARTNERS, INC. <br />Teresita Garcia <br />Partner, Director of Public Involvement <br />authored the Guide to the Building Permit Process for the Unincorporated Areas of Metropolitan Dade County, which outlines the <br />building permit process and presents a description of the permitting agencies responsibilities. This guidebook was prepared as a tool <br />to facilitate the regulatory and permitting process to assist expanding companies and new finns relocating to the area. <br />Transportation Projects, Greater Miami Director of Planning Development and Transportation - Director for Planning Development <br />and Transportation. worked with economic development organizations in the review and analysis of local and state development <br />regulations and acted as a liaison between regulatory agencies and the business community. Led the staff effort in the creation of <br />broad -based business and community transportation coalitions and directed all committees of the transportation group. Instrumental <br />in the planning and implementation of the first Transportation Summits established by the Chamber. <br />Greater Miami Chamber of Commerce Transportation Summit - Responsible for organization and coordination of the Summit and <br />community outreach program. Encompassed setting up meetings with grassroots organizations throughout MiamFDode County <br />to present together with representatives from the Florida Department of Transportation. MPO. Miami -Dade County Public Works <br />Department and Miami -Dade Transit Agency the specific projects that are planned for each area. <br />FDOT District 6, Public Involvement Dlstdctwide Contract, Miami -Dade County & the Keys (2006 - 2011) - Project Manager overseeing <br />8 pubic involvement specialists charged with providing outreach services in relation to planning and design projects for FDOT. Ms. <br />Garcia led strategic efforts after recent changes in legislation for Community Outreach related to Improvements to the historically - <br />designated 57th Avenue Corridor from US 1 Road to SW 8th Street. B &A successfully delivered public involvement programs for over <br />100 design projects for FDOT, District Six. <br />Miami -Dade Expressway Authority, Miami -Dade County, Florida - Public Involvement Director for General Engineering Consultant. <br />Responsible for developing strategies and overseeing all public involvement and community awareness programs throughout <br />the master planning and final design phases of MDX's projects. This has included strategic and extensive community awareness <br />campaigns to reach the impacted communities using workshops, presentations to elected officials and Community Councils, open <br />house, community meetings, speaker's bureaus, fact sheets, newsletters. website, PowerPoint presentations and public hearings. <br />Highlights of current and past efforts include: <br />MDX Long Range Master Transportation Plan (2025 and 2035 Update) - Every five years MDX updates their Long Range Transportation <br />Plan and identifies new projects through a visioning process with its Board of Directors, transportation partners and the public. This <br />update included the use of a new innovative preference survey technology (Turning Point) with the Board Members to gather and <br />present live results of priorities for all presented projects. Initial tasks included working with the technical planning team on a needs <br />assessment of transportation needs in Miami -Dade County and the identification on potential projects where MDX could be a catalyst <br />in providing mobility to the region. Public outreach consists of providing public involvement and information through the concept <br />planning phase including interagency coordination and outreach to stakeholders in the area. <br />MDX Project Development and Environment Studies (PD&E) - Ms. Garcia oversees or leads the public involvement programs for the <br />following PD &E's , making sure that project activities are in compfance with all federal and state public involvement guidelines and <br />assists with the public affairs programs for the projects. These studies include: <br />• SR 924 /Gratigny Extension West to the Turnpike Project Development & Environment Study (PD &E) <br />• SR 874 /Don Shula Ramp Connector to SW 128 Street State Environmental Impact Report (completed) <br />• SR 924 /Gratigny Extension East to 1 -95 inclusion into the MPO 2030 Long Range Plan fPD &E) <br />• US I Express (Managed Lanes) PD &E <br />• SR 836 Improvements from NW 57th Avenue to 17th Avenue State Environmental Report (completed) <br />MDX SR 874 State Environmental Report (SEIR) and final Design - Led public involvement efforts through the SEIR which included the <br />preparation and implementation of a Public Involvement Plan for the proposed improvements to SR 874. The SEIR is an environmental <br />impact study that evaluates alternatives for corridor improvements and identifies mitigating measures where necessary as well as <br />suggests specific projects and alignments. This project included the establishment of a close working relationship with all district <br />elected officials, the creation of a Citizens Advisory Committee, multiple community presentations and two Public Hearings. As the <br />lead Public Information Officer during the final design phase for both projects now under construction, a process was designed to <br />obtain community confirmation for noise walls following state guidelines with meetings, surveys and the preparation and execution of <br />noise wall agreements in coordination with MDX's legal counsel. <br />CONTINUING PROFESSIONAL SERVICES I RFO NO. 14 -07 -02 <br />90 <br />