Laserfiche WebLink
1 <br />1 <br />tl.. <br />1 6. •�� p <br />W N <br />�dPOA* E <br />1 Julio Robaina <br />Mayor <br />1 Esteban Bovo <br />Council President <br />1 Eduardo Gonzalez <br />Council Vice - President <br />1 Council Metnber <br />Jose F. Caragol <br />Luis E: Gonzalez <br />1 Carlos Hernandez <br />Cindy Miel <br />Jose Yedra <br />E 3 <br />Armando Vidal, P.E. <br />1 Director <br />City of Hialeah <br />Department of Water & Sewers <br />January 19, 2006 <br />RE: City of Hialeah <br />Sewer Purnp Station No. 200 <br />To whom it May Concern: <br />This letter is to certify that SRS Engineering, Inc. as consultants to the <br />City of Hialeah were contracted to design a new regional sewer pump <br />station to serve the newly annexed area of the City. <br />The design is for a large sewer pump station capable of handling 8.06 <br />MGD. The pump station will be the largest in the City of Hialeah <br />consisting of a two -story wet well/dry well building with four 470- <br />horsepower pumps, ' electrical control systems, telemetry and backup <br />generator with a fuel tank. The project also includes the design of the <br />pump station site area and approximately 2,800 If of 36 -inch sewer force <br />main; 10,600 If of-24-inch sewer force main and approximately 1 j500 If of <br />30 -inch gravity sewer main. <br />SRS has met all the requirements of this project in a timely and efficient <br />manner. <br />Please feel free to contact me with any questions. <br />1 Sincerely, <br />'� <br />1 Jose Rodriguez P.E. <br />Engineering Coordinator <br />JR: mn <br />cc: Armando Vidal, P.E. Director <br />1 <br />1 ' 3700 W. 4TH AVENUE • HIALEAH, FLORIDA 330124298 <br />TELEPHONE: (305) 556 -3800 <br />1 <br />