My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRS Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
SRS Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:03:41 PM
Creation date
8/18/2014 4:49:26 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cftp of Aim, <br />(5 <br />To Whom it May Concern <br />Carlos A. Migoya <br />City Manager <br />Subject Reference Letter for Consultant's Project Manager <br />Name of Proposer: SRS Engineering, Inc. Name of Project Manager: Olivedo Sanchez <br />The above referenced Consultant is submitting on a Request for Qualifications that has been <br />issued by the City of Miami. We require that the Proposer provide written references for their <br />Project Manager (PM) with their submission and by providing you with this document the <br />Consultant is requesting that you provide the following reference information. We would <br />appreciate you providing the information requested below as well as any other information your <br />feel is pertinent: <br />Name of Project: <br />City of Hialeah Fueling Station <br />Scope of work: Design of Fueling Station including new canopy, pumps, tanks, booth & site pvmt. <br />Value of project: $647,285 Value of Design Services: $73,408.43 <br />Delivery method: [] Design - Bid -Build El CM @Risk E] Design -Build ® Other ( cc, ) <br />Construction completed on time & within budget: ® Yes ❑ No <br />If no, did the PM at contribute to the delay(s) or increased cost? ❑ Yes ® No <br />Quality of Design: ® Above expectations ❑ Average ❑ Below Expectations <br />Errors and Omissions: ❑ Above expectations ❑ Average ❑x Below Expectations <br />(Above expectations means there were fewer errors & omissions than anticipated) <br />Did Errors & Omissions result in increased construction cost? <br />Was the Project Manager responsive to the Owner & Contractor? <br />Was the Project Manger timely with reviews and submittals? <br />Did the Project Manger quickly resolve issues as they arose? <br />Comments: <br />Excellent engineering firm. Professional <br />10+ years. <br />Name of individua <br />Signature: rector Telephone: <br />Sincerely, <br />Gary Fabrik Assistant D <br />this form: <br />Guanchez <br />❑ Yes ® No <br />x❑ Yes ❑ No <br />© Yes ❑ No <br />® Yes ❑ No <br />Date:04 /01 /10 <br />Title: Director, Const. & Maint. <br />E -mail: JGUANCHEZ @HIALEAHFL.GOV <br />RFQ -PM -R <br />
The URL can be used to link to this page
Your browser does not support the video tag.