My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRS Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
SRS Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:03:41 PM
Creation date
8/18/2014 4:49:26 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6itp of Alami <br />(,:.`)= Johnny Martinez, P.E. <br />1 '< ,,.�" City Manager <br />To Whom it May Concern <br />Subject: Reference Letter for Consultant <br />Name of Proposer: SRS Engineering, Inc. <br />The above referenced Consultant is submitting on a Request for Qualifications that has been <br />issued by the City of Miami. We require that the Proposer provide written references with their <br />submission and by providing you with this document the Consultant is requesting that you <br />provide the following reference information. We would appreciate you providing the information <br />1 requested below as well as any other information your feel is pertinent: <br />Name of Project: Naranja Lakes CRA Consultant Consultant (Construction Administration and Inspections) <br />Owners representative for construction phase of new community building, and right of way <br />improvements including roadway, drainage, water and sewer, and landscaping improvements. <br />Scope of work: <br />Value of project: S 17,745,355 Value of Design Services: $ 208,000 nn� <br />' Delivery method: [] Design-Bid-Build F) CM @Risk ❑ Design -Build K Other (Oms�- AAW% ) <br />Design completed on time & within budget: k Yes ❑ No Date completed: 0512011 <br />If no, was the Consultant at fault or contribute to the delay(s) or increased cost? ❑ Yes ❑ No <br />Quality of Design: 2 Above expectations ❑ Average ❑ Below Expectations <br />Errors & Omissions: U Above expectations ❑ Average ❑ Below Expectations <br />(Above expectations means there were fewer errors & omissions than anticipated) <br />Did Errors & Omissions result in increased construction cost? ❑ Yes )f No <br />Did Consultant provide Construction Administration services? Yes ❑ No ❑ limited scope <br />Was the Consultant responsive to the Owner & Contractor ?: R Yes ❑ No <br />Name of individual pl 'h this form: Jorge M. Fernandez <br />Signature: <br />Telephone: 7(3'02)375 -1543 <br />Sincerely, <br />Jeovanny Rodriguez, P.E. <br />Assistant Director <br />Date: r /ro/r! <br />Title: Coordinator, Strategic Business Mgmt. <br />E-mail: jjorge @miamidade.gov <br />1:7801191:1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.