Laserfiche WebLink
RELEVANT EXPERIENCE <br />PROJECT NAME: <br />City of Hialeah <br />t rt <br />Fleet Fueling Station <br />CLIENT'S NAME: <br />City of Hialeah <br />Mr. Jorge Guanchez <br />r 1 L <br />(305) 687 -2660 <br />TYPE OF FACILITY <br />Fueling Station <br />OR SERVICES: <br />SRS PROJECT FEE: <br />$73,408 <br />CONSTRUCTION COST: <br />$636,444 <br />COMPLETION DATE: <br />February 2008 to <br />December 2009 <br />KEY INDIVIDUALS Ignacio Serralta, P.E. <br />INVOLVED: Oliverio Sanchez, P.E. <br />PROJECT DESCRIPTION: <br />SRS services included the preparation of <br />several conceptual site plan layouts for <br />approval by the City. Preparation of <br />construction documents for construction of a <br />new fleet fueling station including replacing <br />existing asphalt and concrete pavements, <br />drainage systems, new fuel management <br />systems, new video security systems, new <br />electrical, fueling pumps, dispensers, <br />underground fuel lines and appurtances, <br />attendant's booth with power, A/C and data, <br />replacement of existing underground fuel <br />tank, and replacing the existing canopy. <br />Other services included contracting and <br />coordinating all topographical surveys and <br />geotechnical investigations; and all <br />permitting including City of Hialeah Building <br />Department, DERM, and FIRE. <br />Construction Phase services included attending <br />construction meetings, reviewing shop <br />drawings, responding to RFI's, providing <br />periodic construction observations, and <br />preparing close -out documents. <br />ENGINEERING,INC. <br />J �t It � �%� •- _•-•� -• _ __� �. <br />t rt <br />L p �j T-' ,r• r�� �7 <br />r 1 L <br />r \ i <br />l•0, <br />to u -- —o= - <br />ENGINEERING,INC. <br />