My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRS Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
SRS Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:03:41 PM
Creation date
8/18/2014 4:49:26 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RELEVANT EXPERIENCE <br />PROJECT NAME: <br />West 361h Avenue <br />' <br />(NW 97th Avenue) <br />CLIENT'S NAME: <br />City of Hialeah <br />Streets Department <br />' <br />Mr. Jorge Hernandez,PE <br />(305) 687 -2656 <br />TYPE OF FACILITY <br />Roadway & Drainage <br />OR SERVICES: <br />Improvements W 361h <br />Ave. (NW 971' Ave) <br />SRS PROJECT FEE: <br />$149,600 <br />CONST. COST: <br />$3,045,000 <br />1 COMPLETION DATE: <br />June 2007 <br />KEY INDIVIDUALS <br />Ignacio Serralta, P.E. <br />INVOLVED: <br />Jean - Claude Fontaneau <br />PROJECT DESCRIPTION: <br />1 SRS provided engineering design, preparation of <br />construction documents, plan permitting (DERM), <br />and pre- construction phase support services to <br />the City of Hialeah for the construction of W. 3611 <br />Avenue between N.W. 138th Street and N.W. <br />154th. Work included the preparation of designs <br />for the construction of paving, grading and <br />drainage improvements and street lighting <br />associated with the new roadway construction. <br />The project included meeting with City of Hialeah <br />staff and local regulatory agencies to establish <br />design guidelines, conduct a utility search and <br />identification of existing utilities and traffic <br />controls, and review roadway design standards. <br />We also designed and prepared the construction <br />documents for the project that included the <br />preparation of summary of quantities, signage <br />and marking plans and quantities, MOT plan, <br />specifications, and engineer's estimate of <br />probable construction cost. <br />SRS performed pre- construction support services, <br />1 including attending pre -bid meeting, responding <br />to pre -bid request for information, and review of <br />Bids. Also, providing supplemental information <br />and clarification of construction documents to <br />prospective bidders in the bid solicitation process, <br />review bid submittals, and attend bid - opening <br />meeting. <br />1 <br />�o <br />ENGIN EERING.INL. <br />
The URL can be used to link to this page
Your browser does not support the video tag.