Laserfiche WebLink
RELEVANT EXPERIENCE <br />1 <br />1 PROJECT NAME: NW 138`h Street <br />CLIENT'S NAME: City of Hialeah <br />Streets Department <br />Mr. Jorge Hernandez <br />(305) 687 -2656 <br />TYPE OF FACILITY Roadway & Drainage <br />OR SERVICES: Improvements <br />NW 1381h Street <br />Widening <br />SRS PROJECT FEE: $417,374 <br />CONST. COST: $12,450,000 <br />COMPLETION DATE: March 2007 to <br />December 2008 <br />KEY INDIVIDUALS Ignacio Serralta, P.E. <br />INVOLVED: Oliverio Sanchez, P.E. <br />Jean - Claude Fontaneau <br />PROJECT DESCRIPTION: <br />SRS was responsible for the engineering design, <br />preparation of construction documents, plans permitting <br />(Miami -Dade County Public Works, DERM, SFWMD, & <br />FDOT), pre- construction phase support services to the <br />City of Hialeah for the construction of NW 138`" Street <br />between 1 -75 and N.W. 107`" Avenue. The work includes <br />the preparation of designs for the construction of <br />drainage improvements, street lighting and signalization, <br />together with the design of a new 50' wide canal <br />including culverts and a canal wall along the north side of <br />NW 1381h Street between NW 971h Avenue and 1 -75. The <br />new design includes a 6 -lane divided roadway, double <br />left turns and deceleration lanes, and signalized <br />intersections at NW 97th Avenue, NW 102 n Avenue, and <br />NW 107`" Avenue. <br />Construction administration support and inspection <br />services during the construction including review shop <br />drawings, respond to RFls, review payment request, <br />conduct periodic inspections, and engineer certifications <br />DD <br />x� <br />r <br />rr__GG7 <br />�. Y i,'�ENGINEE R ING,I N C.�k „my <br />1 <br />r..` <br />rr__GG7 <br />�. Y i,'�ENGINEE R ING,I N C.�k „my <br />