My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRS Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
SRS Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:03:41 PM
Creation date
8/18/2014 4:49:26 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RELEVANT EXPERIENCE <br />PROJECT NAME: <br />Miami International Airport <br />Employee Parking Area <br />Storm Water Study <br />and Design of Interim <br />Drainage Improvements <br />Miami, Florida <br />CLIENT'S NAME: <br />Miami International Airport <br />TYPE OF FACILITY <br />Design and CEI Services <br />' OR SERVICES: <br />SRS PROJECT FEE: <br />$ 78,000.00 <br />COMPLETION DATE: Started: January 1999 <br />Completed: Feb. 2000 <br />KEY INDIVIDUALS Ignacio Serralta, P.E. <br />INVOLVED: Patrick J. Rebull, P.E. <br />PROJECT DESCRIPTION: <br />1 Provision of on -going miscellaneous civil engineering <br />services to meet the requirements for fast response and <br />specialized engineering services for the Miami -Dade <br />Aviation Department. <br />This service order required conducting a study for the <br />2000 vehicle 700 -acre employee parking lot and <br />drainage basin at Miami International Airport. The study <br />analyzed the current drainage system and made <br />recommendations for the improvement of the system to <br />' facilitate drainage of the parking lot while meeting DERM <br />and South Florida Water Management District design <br />criteria. <br />The project involved data gathering, analysis of existing <br />conditions, determination of future land use impact, <br />development and evaluation of alternatives including <br />1 storm water modeling for the 5, 10, 25 and 100 year <br />storm flows, cost engineering and presentation of final <br />recommendations. <br />A second service order involved preparation of design <br />and construction documents for the construction of <br />interim drainage improvements to resolve severe flooding <br />1 conditions in three of the sub - drainage basins. This <br />project is currently under construction with on -going <br />construction administration services being provided. <br />1 <br />rA <br />Ir <br />1 �^ <br />(' d: ENGINEERING,ING. <br />
The URL can be used to link to this page
Your browser does not support the video tag.