My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRS Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
SRS Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:03:41 PM
Creation date
8/18/2014 4:49:26 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RELEVANT EXPERIENCE <br />PROJECT NAME <br />CLIENT'S NAME <br />TYPE OF FACILITY <br />OR SERVICES: <br />Ponce de Leon Blvd. CEI <br />City of Coral Gables <br />Depart. of Public Works <br />Mr, Ernesto Pino, RA <br />(305) 460 -5004 <br />Construction Inspection <br />Services <br />SRS PROJECT FEE: <br />S 194,663.53 <br />CONSTRUCTION <br />COST: <br />S 1,816,772.42 <br />COMPLETION DATE: <br />01/05/2012 <br />KEY INDIVIDUALS <br />Ignacio Serralta, P.E. <br />INVOLVED: <br />Oliverio Sanchez. P.E. <br />Ralph Pereda <br />Luis Hurtado <br />PROJECT DESCRIPTION: <br />Construction administration support and inspection services <br />during the construction of Ponce de Leon Boulevard Median <br />Beautification project as required by the Department in order <br />to meet FDOT's LAP Program requirements. Scope of Work <br />included, but not limited to, the following: <br />• Provide CEI and construction administration services as required for <br />the LAP Program. <br />• Attend precorstrudon meeting and prepare minutes for distribution. <br />• Review shop drawings submitted by Contractor for adherence to <br />construction documents. <br />• Attend bFweekly progress meetings and prepare for minutes for <br />d&nbution. <br />• Respond to Contractor request for information and ctaoflcation of <br />contract documents. <br />• Coordinate utility issuestconflicts. <br />• Process all construction correspondence and documents. <br />• Review and recommend Contractor payment requisitions. <br />• Review Contractors certified payrolls. <br />• Conduct labor interviews to assure wage rate compliance. <br />• Verify Contractors Disadvantaged Business Enterprise (DBE) on- <br />going training program. <br />• Review Contractor EEO requirements. <br />• Provide On the Job Training (OJT) monitoring and reporting. <br />• Review and recommend Contractor change order requests, d any. <br />• Provide full-time inspector (40 fours per week). <br />• Conduct semi-final inspection and prepare punch list. <br />• Conduct final inspection, punch list, and contract dose -out. <br />• QA/QC — limited materials and density testing Provide independent <br />assurance testing and coordinate with testing lab to obtain sampling <br />and testing. Compare test results and document in project records. <br />• Provide photo history of project in digital format. <br />• Other construction phase engineering services as requested by <br />the Department. <br />b � <br />( r e9� %�t"A1j✓j <br />r b a <br />�• oe oa zojo <br />7` <br />E <br />C <br />�T� +nn•� .y�a�"ENGIN EERING INC.�� s �i <br />
The URL can be used to link to this page
Your browser does not support the video tag.