My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRS Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
SRS Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:03:41 PM
Creation date
8/18/2014 4:49:26 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />RELEVANT EXPERIENCE <br />PROJECT NAME: <br />CLIENT'S NAME: <br />TYPE OF FACILITY <br />OR SERVICES: <br />SRS PROJECT FEE: <br />COMPLETION DATE: <br />KEY INDIVIDUALS <br />INVOLVED: <br />South Florida Evaluation <br />and Treatment Center <br />Florida City, Florida <br />Design -Built <br />Schenkel Shultz <br />Architecture <br />111East Wayne Street, <br />Suite 555 <br />Fort Wayne, IN 46835 <br />Mr. Charles Goodman <br />(407)872 -3322 <br />Civil Engineering Design <br />220 Bed Evaluation and <br />Treatment Center <br />June 2006 <br />Ignacio Serralta, P.E. <br />Oliverio Sanchez, P.E. <br />Jean - Claude Fontaneau <br />Ramon Lopez <br />PROJECT DESCRIPTION: <br />This project consisted of the engineering design <br />plans and specifications for the construction of an <br />approximately 40 -acre evaluation and treatment <br />center located in Florida City, Florida. Work <br />included the design of on -site paving, grading and <br />drainage, surface water management design, off - <br />site roadway improvements, on -site gravity sewer <br />system, private sewer pump stations and force <br />mains and on -site and off -site water system to <br />serve on -site development <br />We also assisted in the preparation of applications <br />and documentation for submittal of an <br />Environmental Resources Permit as required by <br />SFWMD, DERM, and ACOE; preparation of <br />National Pollutant Discharge Elimination System <br />Notice of Intent applications and documentation. <br />Construction phase services including reviewing <br />payment request, responding to RFI, and <br />conducting construction inspections. <br />L 0 <br />ENGIN EERIN G.INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.