My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRS Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
SRS Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:03:41 PM
Creation date
8/18/2014 4:49:26 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RELEVANT EXPERIENCE I <br />aPROJECT NAME: Naranja Lakes CPA <br />CLIENT'S NAME: Naranja Lakes CRA <br />Jorge Fernandez <br />(305) 375 -1543 <br />TYPE OF FACILITY <br />OR SERVICES: <br />SRS PROJECT FEE: <br />CONSTRUCTION <br />COST: <br />COMPLETION DATE: <br />KEY INDIVIDUALS <br />INVOLVED: <br />Const. Management <br />Consultant <br />$ 208,000 <br />S 17,745,355 <br />On -Going <br />Ignacio Serralta, P.E. <br />Jean Claude Fontaneau <br />PROJECT DESCRIPTION: <br />As Construction Consultant, SRS's responsibilities <br />included the review and recommendation of contract <br />reward to the Developer, the review and approval of <br />payment requests submitted by Developer, review and <br />make recommendations pertaining to change orders, <br />design changes and budget reallocations, meeting with <br />the Developer on a regular basis regarding the <br />construction schedule and related issues, conducting <br />regular site visits of the construction site to observe on- <br />going construction, and attend all meetings, as directed <br />by the CRA, to provide consultation to the CRA. <br />As an initial task, SRS prepared a "Preliminary Report <br />consisting of an analysis of the amounts previously paid <br />to the Developer to date as set forth in the twenty -one <br />(21) Request for Payment submitted by the Developer to <br />the CRA and the County including an analysis of <br />changes in scope, materials and quantities from what is <br />set forth in the revised Master Plan of Improvements <br />attached to the First Amendment to the Redevelopment <br />Agreement as well as any amounts paid over budgeted <br />amounts all as reconciled to the approved Schedule of <br />Values. <br />Construction improvements included roadways, <br />landscaping, new bridge, water and sewer pipelines and <br />sewer pump stations. <br />Ii <br />Rgl ullling Dur <br />Cuff141uG11/ <br />TR <br />•.: a �, 1 ems` t�?.��1`�+`tiYfl? <br />pl <br />rl <br />v <br />t, <br />8011; <br />ENGINEERING,INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.