My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRS Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
SRS Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:03:41 PM
Creation date
8/18/2014 4:49:26 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />RELEVANT EXPERIECE <br />1 PROJECT NAME: Miller's Pond Park <br />CLIENT'S NAME: Miami -Dade County <br />Park & Recreation <br />Department <br />Mr. Alan Velez <br />TYPE OF FACILITY <br />OR SERVICES: <br />SRS PROJECT FEE: <br />COMPLETION DATE: <br />KEY INDIVIDUALS <br />INVOLVED: <br />PROJECT DESCRIPTION: <br />Miller's Pond Park <br />New Parking Lot <br />Design <br />$40,000 <br />Est. May 2003 <br />Ignacio Serralta, P.E. <br />Jean - Claude <br />Fontaneau <br />SRS provided the engineering design, permitting <br />and construction phase services of Miller's Pond <br />Park including site utilities, parking area, and <br />concrete walkways. This work included the design <br />of paving, grading, and drainage plans for 118 <br />cars parking lot. Our scope of work also included <br />construction plans for "dry-run" and "final" review <br />by local regulatory agencies including Miami -Dade <br />County Public Works Dept., and Miami -Dade <br />County Park and Recreation Department. <br />Construction Phase services included bi- weekly <br />construction meetings, reviewing shop drawings, <br />responding to RFI's, providing periodic <br />construction observations, and preparing close- <br />out documents. <br />W <br />
The URL can be used to link to this page
Your browser does not support the video tag.