My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRS Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
SRS Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 12:03:41 PM
Creation date
8/18/2014 4:49:26 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RELEVANT EXPERIENCE <br />PROJECT NAME: <br />Miller Drive Widening <br />CLIENT'S NAME: <br />Homestar <br />Mr. Jose Fernandez <br />TYPE OF FACILITY <br />Roadway & Drainage <br />OR SERVICES: <br />Improvements <br />Miller Drive <br />SW 152nd to 158`h Ave. <br />SRS PROJECT FEE: <br />$88,500 <br />COMPLETION DATE: <br />February 2005 <br />KEY INDIVIDUALS <br />Ignacio Serralta, P.E. <br />INVOLVED: <br />Jean - Claude Fontaneau <br />PROJECT DESCRIPTION: <br />SRS provided engineering design, preparation of <br />construction documents, and permitting <br />assistance, and construction phase support <br />services to the Miami -Dade County Public Works <br />Department (M.D.C.P.W) for the widening of <br />Miller Drive between SW 152nd Avenue and SW <br />1 158 Avenue (3,250 LF), as well as including the <br />preparation of designs for the construction of <br />drainage improvements associated with the <br />1 roadway reconstruction. The work included <br />meeting with Miami -Dade County Public Works <br />staff and local regulatory agencies to establish <br />design guidelines, conduct a utility search and <br />identification of existing utilities, existing traffic <br />controls, and review roadway design standards. <br />Construction documents prepared for the project <br />consisted of the roadway plan and profiles, <br />summary of quantities, signage and marking <br />plans, signage and marking quantities, MOT plan, <br />and specifications. <br />Iry <br />EN GINEERING�INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.