Laserfiche WebLink
® e�ehuTEL>i2�- csh«�in & (AioCeatF, I <br />Land Planners • Engineers • Land Surveyors <br />EMERALD APARTMENTS <br />Project Description <br />This project is composed of a 10 story residential Tower with its supporting 3 story parking garage <br />together with the development of the adjoining roads. Schwebke- Shiskin and Associates is the Civil <br />Engineering consultant responsible for the design, permitting and construction administration for all the <br />infrastructure improvement for the development of the subject site. These duties encompass the <br />redevelopment of the full of the Right of Way of NW 72nd Terrace from NW 2 Avenue to NW 3`d <br />Avenue, the design of over 1,500 of 12" water main, provision of sewer and the disposal of storm water <br />via drainage wells and French Drains. <br />Strormwater management modeling software (ICPR) was used in the determination of the stage caused <br />by the 5 year storm event by discharging through a combination of drainage wells and French Drains for <br />the private portion of the development and via French Drain for the development of the Public Right of <br />Way. The interior floors of the garage drain through a French Drain system that contains a 2' thick sand <br />filter to prevent chemical degreasers commonly used on garages to enter the aquifer. An overflow <br />system connects the French Drain to the drainage well to protect the ground floor from possible flooding <br />during very intense storm events. <br />® Location of Prolect.- <br />NW 72" Terrace between NW 2nd Avenue <br />and NW 3`d Avenue <br />Client <br />Company Name: The Gatehouse Group <br />Contact Name : James Koningisor <br />Telephone : (508) 877 -2344 <br />Design Fee <br />Start/Completion Date <br />Construction Contract <br />$70,000.00 <br />January 2007 <br />June 2007 <br />521,000,000.00 <br />NYJ. 72 TERRACE <br />THE <br />]1' 1 <br />Z <br />:.a ll <br />z <br />NAPARME <br />