My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chisholm Architects, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
Chisholm Architects, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:30:13 AM
Creation date
8/18/2014 4:56:11 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S-C&9E9k E -,z--Sfi i I k iP- - & 4:�-Aloia-ItEl <br />Land Planners • Engineers • Land Surveyors <br />PENNSYLVANIA GARAGE <br />Proicet Description <br />This project is composed of a 6 story parking garage with 7,400 square feet of retail space in the ground <br />floor together with the development of the adjoining roads. Schwebke- Shiskin and Associates is the <br />Civil Engineering consultant responsible for the design, permitting and construction administration for <br />all the infrastructure improvement for the development of the subject site. These duties encompass the <br />redevelopment of half of the Right of Ways of all three street surrounding the property, Pennsylvania <br />Avenue, 17`h Street and North Lincoln Lane, the provision of public utilities (water and sewer) and the <br />disposal of storm water via drainage wells and connections to the existing City infrastructure which <br />outfall into the Dade Canal. Stormwater management modeling software (ICPR) was used in the <br />determination of the stage caused by the 25 year- 3 day storm event by discharging through the drainage <br />well. The interior floors drain through a French Drain system that contains a 2' thick sand filter to <br />prevent chemical degreasers commonly used on garages to enter the aquifer. An overflow system <br />connects the French Drain to the drainage well by use of an emergency sump pump. <br />This project had to be coordinated with two other projects that are been developed or in bidding stages, <br />New World Symphony and the Capital Improvement Project City Center. <br />/j Location of Project.- <br />® East side of Pennsylvania Avenue between North Lincoln Lane and t 7`h Street. <br />Client <br />Company Fame : City of Miami Beach <br />Contact Name : Tim Hemstreet, Assistant City Manager <br />Telephone :(305) 673 -7030 <br />Desi¢n Fee <br />Start/Completion Date <br />Construction Contract <br />545,000.00 <br />April 2009 /June 2009 <br />$12,90U00.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.