Laserfiche WebLink
SV N�J�r1 <br />Off.' �_ .B <br />APPROACH /METHODOLOGY TAB 4 �/ �o `�� <br />In addition to the processes and systems outlined above, our firm requires each of our consultants to also <br />provide their individual expertise and experience in developing an estimated cost and schedule for their specific <br />discipline for inclusion into our estimate of cost and schedule. <br />The Chisholm team's objective is to minimize total costs (construction + life cycle), to reduce construction <br />time, to make the project easier to construct, and to ensure safe operations and environmental /ecological <br />goals. Our team seeks the optimum blend of scheduling, performance, constructability, maintainability, <br />environmental awareness, safety, and cost consciousness. As well as a management technique that uses a <br />systematized approach to seek out the best functional balance between the cost, reliability, and performance <br />of the project. Creative design ideas that change aspects of the proposed project design to accomplish a <br />design, financial, or schedule improvement without changing or diminishing the program plan. Clear and <br />informative construction documents provide for minimum or no change orders. Our process incorporates the <br />values of the major stakeholders. These generally include the designer, construction engineer, contractor, <br />state and federal approval agencies, local agencies, and the public. <br />C <br />® City of Sunny Isles Beach, RFQ 14-07.02 <br />Continuing Professional Services for Architectural. <br />Landsceoe Architectural 6 Land Surveying Firms only rCCNAI 8.12.14 <br />