Laserfiche WebLink
I <br />El <br />PROFESSIONAL HISTORY <br />Dui ,r <br />45V��rJ <br />O - B <br />RESUMES TAB 2 o .` <br /><<oa <br />Jorge Iglesias, AIA, NCARB <br />Principal/Project Director, AECOM 1977 - 2013 <br />Construction Manager, RE Chisholm Architects, <br />Inc., Miami, Florida, 2013 - current <br />RELEVANT PROJECT EXPERIENCE <br />CITY GOVERNMENT AND MUNICIPALITIES <br />Construction Manager <br />PROFESSIONAL LICENSES AND REGISTRATION <br />Registered Architect: <br />Florida AR0007692. New York AR028686 <br />EDUCATION <br />Bachelor of Arts in Architecture, 1972, University of Florida <br />Master of Arts in Architecture, 1974, University of Florida <br />COCONUT GROVE EXHIBITION CENTER, MIAMI, FLORIDA <br />The project consisted of a 50,000 SF expansion that included public assembly places and the acoustical treatment of <br />a large gathering hall for public addresses, concerts and exhibitions. Renovation of the existing 100,000 SF structure <br />was incorporated into the new expansion. <br />TRANSPORTATION <br />JFK INTERNATIONAL AIRPORT, AMERICAN AIRLINES TERMINAL, NEW YORK, NEW YORK <br />The project consisted of providing A/E /I services for a new terminal and 56 -Gate complex on a 42 -acre site currently <br />occupied by Terminals 8 and 9 at JFK International. The new terminal will create 2, 200,000 SF and is inclusive of <br />ticketing, baggage claim, FIS, concessions, club space and administrative support area. The project will be phased in <br />over a seven year period in order to allow American Airlines to remain fully operational during the process of this $1.3 <br />billion dollar redevelopment. <br />ORLANDO INTERNATIONAL AIRPORT, AIRSIDE 1 TERMINAL, ORLANDO, FLORIDA <br />Federal Inspection Station Additions & Renovation Airside 1 - project consists of reduction of In- flight Sterile Lounge at <br />Level 2, addition of In- flight Sterile Lounge at Level 1, modifications to Customs Hall Bag Claim, enlargement of the <br />Baggage Check Area, relocation of Security Check to Level 2, and miscellaneous Government office renovations. <br />Page 2 of 2 <br />ORLANDO INTERNATIONAL AIRPORT, AIRSIDE 4 TERMINAL, ORLANDO, FLORIDA <br />Modifications to Customs Hall Baggage Claim, enlargement of Baggage Recheck Area, relocation of Security Check <br />to Level 2, miscellaneous reconfiguration of Meter Greeter Area at Level 2 including the relocation of Currency Ex- <br />change. <br />TOCUMEN INTERNATIONAL AIRPORT, NEW TERMINAL, PANAMA, REPUBLIC OF PANAMA <br />The project consisted of Stages 1 and 2 providing A/E /I services for a new terminal working in a collaborate team with <br />Foster and Partners, London, England and Majol Majol from the Republic of Panama it included 20 -Gates for the <br />Phase 1 complex, Air Traffic Control Tower, new runways access roads fueling system, baggage handling system on <br />the site currently occupied by the existing International Terminal. The new terminal will create a new 75,000 m2 facil- <br />ity as an Icon for the incoming passenger. This work was in collaboration and design by Foster & Partners of Landon. <br />The scope is inclusive of ticketing, baggage claim, FIS, concessions, club space and administrative support area. The <br />Project was a design built with Odebrecht, republic of Panama office <br />City of Sunny Isles Beach, RFQ 14 -07 -02 <br />Continuing Professional Services for Architectural. 1 of 2 <br />Landscape Architectural B Land Surveying Firms only (CCNA) 8.12.14 <br />