Laserfiche WebLink
E <br />West Kendall Baptist Hospital <br />This much needed project consists of the new West Kendall Baptist Hospital which is <br />currently in construction. The hospital complex is on a 30 acre parcel at SW 162 <br />Avenue and SW 96 Street in Miami Dade County. The hospital will provide 134 beds <br />with the capabilities to expand into a 300 bed facility. In addition to the hospital there is <br />a central energy plant, medical arts building, three lakes on -site and a day care facility. <br />The entire complex was design to achieve a LEED's certification which when completed <br />will be the first hospital in the state to hold this LEED certification. DPA was the design <br />site civil engineer for this 30 acre parcel which included the paving, grading, water, <br />sewer, drainage, pedestrian walkways, access management, and signing and pavement <br />marking. The thirteen different at grade parking lots have separate uses for each of the <br />areas of the complex like the doctors gate controlled parking lot, the visitor lot, the <br />employee lot, ambulance parking lot with larger stall sizes, and a discharge parking lot. <br />The total number of parking spaces for this project exceeds 860 spaces. DPA is doing <br />the construction administration for the site civil portion. Mr. Seymour is the Engineer of <br />Record and Project Manager for the design, bidding and construction administration <br />phases for this complex hospital site. <br />Parking Lots and Roadway Network for Southwest Florida International Airport <br />® The Lee County Port Authority (LCPA) in the growing southwest Florida area, <br />recognized the need for a major renovation to its Southwest Florida International Airport <br />patron and employee parking lots in addition to their terminal roadway system. LCPA <br />hired DPA to prepare design documents for these improvements which included a new <br />at -grade 500 space parking lot, modification of the existing parking lots, widening of the <br />terminal frontage roads and connector service roads. Because this challenging project <br />involved several different areas of engineering such as: roadway design, lighting design, <br />structural design, geotechnical, landscaping, permitting, construction cost estimating, <br />and construction management services, it was critical for DPAs staff to coordinate <br />closely in order to meet the project deadline and construction budget. Mr. Seymour was <br />the project engineer and construction project manager for this airport project. <br />11 <br />OTHER SIGNIFICANT PROJECTS: <br />• NW 12 Street from NW 107 Avenue to NW 127 Avenue <br />• Florida City Youth Activity Center- Parking Lot and Site Improvements <br />• NW South River Drive and NW 106 St. Intersection Improvements <br />• Dade County Flashing School Signal Signalization <br />• SR 5 /US 1 in South Dade County <br />• Site Circulation for Harbor House North <br />• Run -up Area /Blast Fence Improvements at Miami International Airport <br />• New World Symphony Parking Garage- Miami Beach <br />2 of, dPa David Plummer & Associates <br />TRANSPORTATION • CML -STRUCTURAL • ENVIRONMENTAL <br />