<br />0 Relevant Experience, Cont. G a ry R. R a t a y, P. E
<br />0 Force Main Route Evaluation Report, North Bay Village, FL — Served as project engineer for the Kimley -Horn team that developed
<br />a force main route evaluation report for the City's force main system. The City's existing sub - aqueous 12 -inch force main system was
<br />® old and deteriorating and required replacement. The proposed 16 -inch force main from the City's main pump station was evaluated
<br />0 to determine the most beneficial route either to the east with a connection point located in the City of Miami Beach or to the west
<br />with a connection point in Miami -Dade County. The proposed force main route included both open -cut and horizontal direction drill
<br />0 (HDD) segments for either approach. The evaluation process included coordination with stakeholders and permitting agencies that
<br />0 had jurisdiction and/or influence over the project to identify requirements, concerns, and obtain feedback pertaining to issues that
<br />® affect the permitting, design, construction, schedule, and cost of the proposed project. The final force main route evaluation report
<br />addressed stakeholders' issues, permit feasibility, project timeframes, preliminary opinions of probable cost, and a recommendation to
<br />0 proceed with the preferred route. The report also included proposed connection points, overall pipe lengths, construction methods, pipe
<br />0 material, and known or potential issues and constraints for each route including environmental issues.
<br />0 Force Main Rehabilitation Design Criteria Package, North Bay Village, FL — Served as project manager. Based on an approved force
<br />0 main route evaluation report, Kimley -Horn developed a Design Criteria Package (DCP) for the City's force main rehabilitation program. The
<br />® DCP was used to select a design -build team for construction of the City's new force main system. The DCP included schematic design
<br />drawings for the remaining open -cut force main route, hydraulic modeling of the main wastewater pump station and force main system,
<br />0 design plans for environmental permitting, design criteria for construct of the project, documents to address land ownership issues, design-
<br />build contracts or `front end" documents, and associated opinions of probable construction costs. The DCP also included field survey,
<br />© environmental survey, geotechnical analysis, extensive utility data collection, stakeholder coordination, and governmental coordination,
<br />including a wastewater agreement with the Miami -Dade Water and Sewer Department. The DCP was submitted to the State of Florida and
<br />0 approved for both American Recovery and Reinvestment Act funding and State Revolving Loan dollars.
<br />0 Force Main Rehabilitation Design -Build Project, Construction Administration, North Bay Village, FL — Based on development
<br />® and approval of a Design Criteria Package (DCP), advertisement of that package, and selection of a Design -Build Team (DBT), served
<br />® as project manager and engineer to provide construction administration services for the City's 4.5 million dollar force main rehabilitation
<br />® program. The project included plan and permit package review during the design development phases, as well as construction
<br />administration tasks, such as shop drawing review, pay application review, contract clarification, onsite observations, and contract
<br />0 close -out. The project included extensive coordination with impacted stakeholders and permitting agencies such as Department of
<br />® Environmental Protection, Department of Environmental Resource Management, Miami -Dade Park and Recreation, Miami -Dade Water
<br />and Sewer Department, City of Miami, Florida Department of Transportation, and Miami -Dade School Board. The project also included
<br />®
<br />assisting the City in collecting 3.5 million dollars in grant and loan funding through the American Recovery and Reinvestment Act
<br />® (ARRA) and State Revolving Loan (SRL) programs.
<br />® Main Wastewater Pump Station Rehabilitation Project, North Bay Village, FL — Served as project manager and engineer to
<br />® developed construction documents and permitting documentation for the rehabilitation of the City's main wastewater pump station.
<br />® The project included analyzing the existing pumping and control equipment to develop a rehabilitation approach to increase system
<br />efficiency, reduce system maintenance, and provide a reliable, redundant pump station to better serve the City. The design included
<br />® pump station equipment rehabilitation, control modifications, installation of Variable Frequency Drives, Motor Control Center (MCC),
<br />® upgrade to the electrical service, and Citywide SCADA system.
<br />® 24 -inch Water Main Route Evaluation Report and Design, West Palm Beach, FL — Served as project manager. As a result of
<br />0 the Florida Department of Transportation (FDOT) relocating the Flagler Memorial Bridge, the City of West Palm Beach was required
<br />® to relocate an existing subaqueous 24 -inch water main that conflicted with the new bridge location. To implement the most beneficial
<br />relocation route for the City, Kimley -Horn developed a water main route evaluation report. The project included evaluating four alternative
<br />® water main alignments to cross the Intracoastal Waterway from the City of West Palm Beach to the Town of Palm Beach. The report
<br />® discussed community impacts, constructability, permit feasibility, and a recommendation to proceed with a preferred water main route.
<br />0 General Engineering Services, Plantation, FL — Served as project manager providing general consulting services for the City of
<br />® Plantation. Worked closely with the City on numerous roadway, drainage, and community enhancement projects, as well as traffic
<br />® studies associated with the proposed improvements. Services have included general planning to develop cost - effective streetscape
<br />and beautification approaches and a traffic calming program. Also assist the City in implementing those visions with thorough, cost-
<br />0 effective roadway, traffic, lighting, landscaping, irrigation, and drainage designs followed by construction phase services