|
®
<br />®
<br />Derrick Lewis, P.
<br />Engineering Deputy Project Manager
<br />1
<br />E.
<br />® -
<br />, rfm [R J, IJIT; UjLqu
<br />®
<br />1 -95 Master Plan for 17 Interchanges from Linton Boulevard to Northlake Boulevard, FDOT
<br />Special Qualifications
<br />District Four — Provided drainage design services and cost -risk assessments for this project
<br />■ Has 17 years of experience
<br />®
<br />that entailed the identification of 17 interchange improvement projects (from south of Linton
<br />in the design, analysis and
<br />®
<br />Boulevard to north of Northlake Boulevard) that could move into the design phase in FY 2013/14
<br />preparation of construction
<br />®
<br />and FY 2014/2015. To accomplish this, Kimley -Hom developed a methodology that proposed
<br />plans, including roadway
<br />a two -tier approach to identify and prioritize those interchanges that could advance quickly and
<br />geometrics, stormwater
<br />o
<br />have conceptual improvement plans completed by July 1, 2013; the remaining interchange
<br />management, permitting,
<br />®
<br />studies were completed by July 1, 2014 and documented in an Interchange Master Plan.
<br />stormwater pollution
<br />®
<br />■ Experience includes modeling
<br />SR 826 /Palmetto Expressway from W of NW 47th Ave to W of NW 27th Ave AND W of NW
<br />and design of complex
<br />®
<br />27th Ave to W of NW 17th Ave, FOOT District Six — Serving as drainage design engineer.
<br />stormwater management
<br />Also providing permitting for two segments of SR 826 /Palmetto Expressway in Miami -Dade
<br />systems, including exfiltration
<br />®
<br />County: from west of NW 47th Avenue to west of NW 27th Avenue and from west of NW 27th
<br />systems, injection wells, gravity
<br />Avenue to west of NW 17th Avenue. Kimley- Horn's scope includes roadway design, drainage
<br />wells, pump station, and pond
<br />®
<br />design, ADA compliance, value engineering, pavement design, local agency coordination,
<br />systems.
<br />®
<br />public involvement, maintenance of traffic, permitting, utilities coordination, signing and
<br />■ Versed in ICPR, HEC -RAS,
<br />®
<br />pavement markings, signalization, and surveying.
<br />ASAD and Geopak Drainage,
<br />Experience prior to joining Kimley -Horn:
<br />and various stormwater related
<br />software
<br />®
<br />SR 77 Pond Siting Report, FDOT District One — Principal drainage engineer responsible
<br />■ Served on the Drainage
<br />®
<br />for instituting a comprehensive Storm -Water management strategy for 6 proposed pond
<br />Technical Advisory Committee
<br />®
<br />site alternatives for a fragile wetland ecosystem. This includes extensive coordination and
<br />during tenure with FDOT District
<br />interaction with NWFWMD, FDEP, and a host of federal and local agencies.
<br />Seven
<br />®
<br />©
<br />SR 84 Pond Conversions, FDOT District Four — Engineer of record for dry detention pond
<br />Professional Credentials
<br />Bachelor of Science, Civil
<br />conversion into and wet detention pond. This task included the conversion of a push button
<br />Engineering, University of Central
<br />contract to a District Letting. This project was in a wetland area and required major coordination
<br />Florida
<br />®
<br />with SFWMD.
<br />®
<br />Master of Science, Transportation
<br />Districtwide Specialized Consultant Services NPDES Program Contract, FDOT District
<br />Engineering, Florida International
<br />®
<br />Six — Task lead drainage engineer responsible for task work order contract that involves all
<br />University
<br />®
<br />aspects of outfall inspections as part of compliance with the National Pollutant Discharge and
<br />Professional Engineer in Florida
<br />®
<br />Elimination Program ( NPDES). This is includes drainage analysis design, structural analysis,
<br />FDOT Drainage Technical Advisory
<br />environmental assessments and permitting for outfalls structures located throughout the District.
<br />®
<br />Committee in District VI
<br />®
<br />Districtwide Drainage Studies and Environmental Permitting Contract, FDOT District
<br />Assistant NPDES Coordinator in
<br />Four — Task lead drainage engineer. Drainage and permitting task work order contract that
<br />FDOT District VI
<br />®
<br />involves all aspects of drainage analysis, design and permitting for projects throughout the
<br />District.
<br />Professional Organizations
<br />®
<br />American Society of Civil
<br />SR 823 Reconstruction and Widening, W 46th Street to South of SR 924, FDOT
<br />Engineers (ASCE)
<br />®
<br />District Six — Senior project manager for stormwater management, This project included
<br />®
<br />reconstruction of 2 miles of roadway improvements and widening into the Red Road Canal.
<br />In addition, A Bridge Hydraulics Analysis and 2 miles of exfiltration design, which involved
<br />coordination and interaction with DERM and SFWMD.
<br />Kimley> »Horn
<br />®
<br />onso 114.0 Ste., ca,R e.. Rewmes
<br />3-11
<br />
|