|
A
<br />® Relevant Experience, cunt. Derrick Lewis, RE
<br />® SR 823 (24th StreetuSR 972 (Coral Way) Resurfacing & Reconstruction, Miami -Dade County, FL — Senior project manager
<br />® responsible for drainage design, permitting, plan production, hydraulic modeling and written drainage report and Bridge Hydraulic
<br />® Report for 2 miles of SR 823 roadway widening, Bridge Widening and reconstruction improvements. Project included miles of
<br />® Exfiltration Trenches which involved coordination and interaction DERM, FDEP SFWMD and SFWM.
<br />® Crosstown Parkway PD &E Study, Port St. Lucie, FL — Principal drainage engineer responsible for instituting a comprehensive
<br />® stormwater management strategy for the PD &E phase for six river crossing alternatives for a fragile wetland ecosystem, this included
<br />® providing a preliminary drainage report, a pond siting report, location hydraulic report, and bridge hydraulic report. This includes
<br />extensive coordination and interaction with SFWMD, FDEP, Coast Guard, and a host of federal and local agencies.
<br />® Seminole Tribe Immokalee Housing Development, Immokalee, FL — Water resources engineer of record responsible for the
<br />stormwater master plan, plans production, and permitting of this new community This project includes the infrastructure and housing
<br />® development for the Seminole Tribe of Florida Immokalee Reservation.
<br />®1.95 Managed Lanes, Miami- Dade County, FL — Lead drainage project manager to find innovative solutions and provide technical
<br />advice to insure current water management systems are not compromised. Wrote technical proposal to minimize the effects of roadway
<br />® spread due to change in lane widths. This project is a design/build and requires the re- striping of 1 -95 to accommodate express lanes
<br />® which charge a fee for vehicle access
<br />® SW 157th Avenue Reconstruction, Miami -Dade County, FL — Engineer of record for water resources design. This project included
<br />® reconstruction of two miles of roadway improvements. Project included two miles of exfiltration design, which involved coordination and
<br />® interaction with DERM and SFWMD.
<br />® SW 24th Street Coral Way (SR 972) Resurfacing & Reconstruction, Miami -Dade County, FL — Lead drainage engineer
<br />responsible for drainage design, permitting, plan production, hydraulic modeling, and written drainage report of over two miles of SR
<br />972 roadway widening and reconstruction improvements. Project included 20 deep wells which involved coordination and interaction
<br />DERM. FDEP, and SFWM.
<br />NW /NE 36th Street (SR 25) Reconstruction, Miami -Dade County, FL — Lead drainage engineer responsible for drainage design,
<br />permitting, plan production, hydraulic modeling, and report writing of the drainage report of over two miles of SR 25 roadway widening
<br />and reconstruction improvements. Project included 30 deep wells which involved coordination and interaction DERM, FDEP, and
<br />SFWM.
<br />Biscayne Blvd (SR 5) Reconstruction and Pump Station, Miami -Dade County, FL — Lead drainage engineer responsible for
<br />drainage design, permitting, plan production, hydraulic modeling, and report writing of the drainage report of over two miles of SR
<br />5 roadway widening and reconstruction improvements. Project included Pump station design and 30 deep wells which involved
<br />coordination and interaction DERM, FDEP, and SFWMD.
<br />Biscayne Boulevard (SR 5) Reconstruction from NE 67 to NE 87, Miami -Dade County, FL — Drainage engineer responsible
<br />for drainage design, permitting, plan production hydraulic modeling and report writing of the drainage report of over 1.5 miles of SR
<br />5 roadway widening and reconstruction improvements. Project included over 30 deep wells and French Drain design which involved
<br />coordination and interaction DERM, FDEP and SFWM.
<br />Miami -Dade County NW 87th Ave and NW 12th Street Improvements, Miami -Dade County, FL — Project engineer in charge
<br />of one mile roadway resurfacing and drainage design, utility coordination and preparation of construction plans, documents, and
<br />specifications for the project. Project included resurfacing and French Drain design and hydraulic modeling .
<br />RF01aU7A
<br />OY2Np21.1< Sir.�y Isles xa:. GY: P1W Services Resumes vvb
<br />Kimley> »Horn
<br />
|