Laserfiche WebLink
® Relevant Experience, cont. Adam Kerr, P. E <br />® corridor through optimized transit service, car - pooling programs, and promotion of mixed -use development and redevelopment. The <br />® planning process was coordinated with Palm Beach County, the Village of Wellington, the Village of Royal Palm Beach, the City of <br />® Greenacres, and individual land owners along the corridor. <br />® Congress Avenue Signal Warrant Study, Lake Park, FL — Provided opinion of cost for a proposed traffic signal. <br />Broward Avenue and Volusia Street Signal Design, Florida Atlantic University, Boca Raton, FL — Served as project engineer. <br />® Kimley -Horn designed a traffic signal at the intersection of Broward Avenue and Volusia Street on the FAU Boca Raton campus. The <br />® signal is a trombone -style mast arm. The signal serves a busy intersection with a significant amount of pedestrian traffic. Kimley -Horn <br />® worked closely with the trombone -style mast arm manufacture to ensure that the design would meet the wind loading requirements for <br />coastal Florida. <br />® Callery,ludge Grove DR] Analysis, Palm Beach County, FL — Developed in -depth DRI -level traffic analysis to determine the <br />impacts of the proposed 4,000 -acre development in unincorporated Palm Beach County. Involved extensive coordination with multiple <br />® municipalities, FDOT, Treasure Coast Regional Council, and the Florida Department of Community Affairs. Involved comprehensive <br />® review and analysis of long -term traffic patterns in the central - western portion of Palm Beach County. Provided support at numerous <br />® public information and community involvement events. <br />® Franklin Academy, Boynton Beach, FL — Project manager. Franklin Academy is a proposed 1,300- student charter school proposed <br />® to be located along Military Trail, west of Boynton Beach, Florida. Kimley -Horn provided transportation planning services prior to <br />County Commission approval of the site. Kimley -Horn has also provided signal design services for a new mast -arm traffic signal at <br />® Minor Road and Military Trail, as well as turn -lane design for a new turn -lane on Military Trail, and roadway design plans for a rebuild <br />® of Old Military Trail adjacent to the site. Kimley -Horn coordinated closely with Palm Beach County through the design process, and <br />provided construction phase services throughout the construction of the project. Design and construction of the improvements were <br />required within an aggressive 10 -month schedule. <br />A <br />Q <br />0 <br />Greenacres Transportation Element, Comprehensive Plan Amendment, Greenacres, FL — Served as project engineer. Kimley - <br />Horn performed the update to the Transportation Element for the City of Greenacres Comprehensive Plan. Kimley -Horn used the <br />WPBUSA FSUTMS planning model to forecast future traffic conditions in order to determine future roadway levels of service. The <br />WPBUSA FSUTMS planning model was modified to determine the short- and long -range needs for the City roadway network and <br />identify mitigation measures. Kimley -Horn also provided direction to the City regarding its designation of future motorized and non - <br />motorized traffic circulation systems with the improvement to those existing systems throughout the City of Greenacres. <br />1.95 Master Plan for 17 Interchanges from Linton Boulevard to Northlake Boulevard, FDOT District Four — Served as traffic <br />engineer for this project that entailed the identification of 17 interchange improvement projects (from south of Linton Boulevard to north <br />of Northlake Boulevard) that could move into the design phase in FY 2013/14 and FY 2014/2015. To accomplish this, Kimley -Horn <br />developed a methodology that proposed a two -tier approach to identify and prioritize those interchanges that could advance quickly <br />and have conceptual improvement plans completed by July 1, 2013; the remaining interchange studies were completed by July 1, 2014 <br />and documented in an Interchange Master Plan (IMP). <br />Kings Highway (SR 713) from Okeechobee Road (SR 70) to US 1 (SR 5) PD &E Study, FDOT District Four — Served as project <br />engineer. Kimley -Horn performed a PD &E study to widen an existing two -lane roadway to a four- or six -lane divided roadway. This 10- <br />mile project included all environmental and engineering reports necessary to evaluate alternative corridors and alternative alignments <br />within the selected corridor. The project also included public information meetings and public workshops with local residents and <br />elected officials. Additional services included the preparation of a detailed concept plan, right -of -way maps, and a pond siting report to <br />determine additional right -of -way needs. <br />Lake Worth Beach Redevelopment, Lake Worth, FL — Traffic engineer for the preliminary site plan development. Advised site plan <br />team on access management and traffic circulation issues. <br />SR 7 /Pioneer Road Signal, Royal Palm Beach, FL — Served as project manager. Kimley -Horn designed a traffic signal at the <br />intersection of SR 7 and Pioneer Road in Royal Palm Beach. The mast -arm design included a dual -arm design, with one of the arms <br />spanning a six -lane approach to the intersection. The design required special consideration for drainage and topography. Construction <br />had to be coordinated with the widening of SR 7, as well as the widening of Pioneer Road. <br />R=o 14d7o <br />oy2 1.14-0 Su k de. W: Pd sen pm .i <br />Kimley >> )Horn <br />