Laserfiche WebLink
O <br />O Relevant Experience, cont. Kevin S c h a n e n, RE <br />® D -8 Emergency Stormwater Pumping Station and Collection System Piping, Palm Beach, FL — Served as project engineer for <br />o the design, bidding, and construction phase services of this stormwater pumping station in the Town of Palm Beach. This includes <br />® expanding the existing station from a capacity of 30,000 GPM to 105,000 GPM, construction of a new outfall to the Intracoastal <br />® Waterway, installation of a new 750 -kW emergency generator, and associated collection system upgrades and utility relocations. <br />® D -9 Stormwater Pump Station, Palm Beach, FL — Served as project manager for the design of this stormwater pumping station in <br />® the Town of Palm Beach. This project includes expanding the existing station from a capacity of 52,000 GPM to 90,000 GPM, wet well <br />® expansion, 800 -kW emergency generator and ventilation system design, and associated collection system upgrades. <br />® Town of Palm Beach D -8 Stormwater Pumping Station, Palm Beach, FL — Serves as project engineer for the design, bidding, <br />® and construction phase services of this stormwater pumping station in the Town of Palm Beach. This includes expanding the existing <br />station from a capacity of 30,000 gpm to 105,000 gpm, construction of a new ouffall to the Intracoastal Waterway, and associated <br />® collection system upgrades and utility relocations. <br />it Town of Palm Beach D -3 Pump Station, Palm Beach, FL — Provided on -call construction phase services for this 60,000 GPM <br />® stormwater pump station located in the Town of Palm Beach. <br />® <br />Town of Palm Beach D -10 Stormwater Pumping Station, Palm Beach, FL — Project manager for the design of this stormwater <br />pumping station. Project includes expanding the existing station from a capacity of 78,000 GPM to 150,000 GPM, generator and <br />® ventilation system design, and associated collection system upgrades. <br />® Jupiter Water High Service Pumps 17 &18, Jupiter, FL — Served as project manager for the installation of two high service pumps <br />® at the Central Blvd. water storage facility. Due to water restrictions, the peak flows demanded by the system outpaced the high service <br />® pumping capacity of the water treatment plant on the days that irrigation is allowed by the water management district. The installation of <br />® the final two pumps in the transmission system matrix will allow the Town to keep pace with the irrigation demand while maintaining a <br />consistent system pressure. <br />ID <br />® Town of Palm Beach D -15 Cooling System, Palm Beach, FL — Serves as project manager for the design of cooling water wells and <br />heat exchanger replacements to support the cooling needs of nine diesel engine driven hydraulic stormwater pumps in the Town of <br />® Palm Beach. Interior piping modifications as well as heat exchanger replacements are also included in this project. <br />O Indian River County Utilities West Transmission Force Main, In -Line Pump Station, Vero Beach, FL — Served as project <br />engineer for the design of an in -line pump station from an existing master pump station to divert wastewater capacity from their South <br />® Regional Wastewater Treatment Facility to their West Regional Wastewater Treatment Facility. This approach not only addressed their <br />master planning efforts, but eliminated odor issues at the existing facility, allowed planned rehabilitation at the existing pump station. <br />o and provided much more flexibility in diverting wastewater to either of their facilities. <br />4) Town of Palm Beach Sanitary Inline Booster Pumping Station, West Palm Beach, FL— Served as project manager to provide <br />O design services for this 5 -MGD sanitary sewer inline booster station which will allow the Town to demolish an existing pump station <br />and enter directly into the West Palm Beach forcemain system near 23rd Street and Tamarind Avenue. The design included influent <br />® and effluent forcemain modifications, construction of a new electrical building, installation of a 350 kW emergency generator, and the <br />o installation of five VFD driven centrifugal wastewater pumps. The pumps were designed to be installed in an exterior, above ground, <br />0 dry condition so that costs could be saved by constructing a smaller building. <br />® Town of Palm Beach In -line Booster Pumping Station, Palm Beach, FL — Served as project manager to provide conceptual design <br />® services for this five -MGD sanitary sewer inline booster station which will allow the Town to demolish an existing repump station and <br />® enter directly into the West Palm Beach force main system near 23rd Street and Tamarind Avenue. The design included influent and <br />effluent force main modifications, construction of a new electrical building, installation of a 350 -kW emergency generator, and the <br />® installation of five VFD- driven centrifugal wastewater pumps. <br />® RM14 -0,� Kimley »)Horn <br />® OY250021.14-0 Su yts d ..Ca Pml Services Resum .v 3-26 <br />