|
® Relevant Experience, cunt. J o rq e Fernandez, P. E
<br />® RiverFront, Miami, FL — Prepared the plans development submittal and provided utility coordination, site calculations, cross - sections,
<br />® and paving and grading for this 11 -acre site for a six -tower residential development.
<br />® Bank of America (Coral Way and 147th Avenue, Bird Road and 152nd Avenue), FL — Providing permitting, approval coordination,
<br />cut and fill analysis, public works plans, site utility study, and lift station calculations.
<br />® 3333 Biscayne, Miami, FL — Project manager responsible for the site civil elements of this 15 -story office building. Kimley -Horn
<br />applied the following green/sustainable elements and practices: A/C condensate for irrigation, pedestrian garden area, pervious pavers,
<br />® quality/quantity drainage, domestic and landscape water use efficiency, building energy efficiency, waste reduction management, and
<br />B an indoor environmental layout.
<br />® Brickell Tennis Club, Miami, FL — Served as analyst and provided utility and drainage reporting and coordination, permitting, and
<br />® ICPR. Kimley -Horn prepared the civil and landscape documents for this three -acre tennis facility. The first of its kind in downtown
<br />® Miami, the club is a tropical oasis and resort amenity to the Four Seasons Hotel.
<br />® ICE, Miami, FL — Provided Miami -Dade Water and Sewer District and FDOT construction document productions, permit coordination,
<br />® underground utility coordination, site utility study, profiling, OPC /construction estimating, roadway alignment, drainage inspections, and
<br />MEP coordination.
<br />® Infinity at Brickell (Infinity I and II), Miami, FL — Provided on -site and off -site drainage, permitting, site inspection, utility, water and
<br />® sewer design, project management, development coordination and assistance, fire protection, finished -floor analysis, drainage well
<br />® design, municipality coordination, and revision services.
<br />® 3050 Biscayne/3100 Biscayne, Miami, FL — For this site utility study, provided site and drainage evaluation, permitting, zoning,
<br />® drainage analysis, surveyor and attorney coordination, and utility coordination for this residential tower development.
<br />® Bay View Market — Provided permitting, plans development submittals, utility coordination and profiling, project work planning, storm
<br />® sewer excavation and relocation, utility relocations, and construction coordination.
<br />Terrazas RiverPark Village, Miami, FL — Located in the City of Miami, this project will consist of two high -rise towers featuring
<br />® beautiful views of the Miami River and Sewell Park, a 10 -acre city park. Originally, this site consisted of a condemned hospital and
<br />® many large trees. Serving as project analyst, provided utility coordination and performed the site utility study for this urban residential
<br />development.
<br />® Hialeah Park Development of Regional Impact (DRI), Hialeah, FL — Served as RAC /UCBD scheduler and provided civil
<br />® coordination. Kimley -Horn provided entitlement services, including DRI, comprehensive plan amendment, rezoning, and master
<br />planning for the redevelopment of Hialeah Park. Hialeah Park is a 202 -acre, former horse racing facility that first opened in 1926.
<br />The redeveloped site is expected to include 3,760 residential units, retail and office space, a town center, school, and several parks
<br />® and urban plazas. For future portions of the project, Kimley -Horn will provide civil engineering, urban design, landscape architecture,
<br />® planning, and project management services.
<br />Faena Miami Beach, Miami Beach, FL — Serving as program manager for the Kimley -Horn team that is providing civil and traffic
<br />® engineering services for this mixed -use project located on eight city blocks. The project involves renovations and improvements to the
<br />existing historic Saxony, Versailles, and Atlantic hotels, which were originally completed in the 1940s. As part of the new Faena District,
<br />® the project also includes construction of five condominium buildings, an underground parking garage, event space, and two separate
<br />® amenity decks to serve the hotel and condo towers. Our services include due diligence; schematic design; landscape architecture;
<br />® permitting through the City of Miami Beach WASD and DERM, FDOT, FDEP, and SFWMD; preparation of contract documents; and
<br />construction phase assistance.
<br />® Miami Children's Hospital, Miami, FL — Served as project engineer. Kimley -Horn provided civil engineering services to Miami
<br />Children's Hospital for a parking garage, central energy plant, and oxygen plant. Associated civil engineering services included
<br />o drainage design, roadway design, easement coordination, permitting, development of a stormwater management plan, design of
<br />o underground storage tanks, and the preparation of construction documents.
<br />® U0„ -07� Kimley »)Horn
<br />Oorze 1.14o spy asks 3-30
<br />
|