|
® Relevant Experience, cont. Mark Santos, RE
<br />®Target's national pavement management program team. Services include conducting a pavement condition survey, analysis, and
<br />recommendations for repairs. During the construction phase, Kimley -Horn represents Target as the owner's site representative. This
<br />® work includes coordination between the contractors and Target store personnel, tracking quantities, quality assurance, and project
<br />® closeout.
<br />® Orlando Premium Outlets (Vineland Avenue), Orlando, FL — Serving as project engineer. Kimley -Horn provided site civil,
<br />® traffic, and permitting services for the 120,000- square -foot Phase II expansion of the center. Previously, we had provided the civil
<br />engineering and landscape design of this 480,000- square -foot retail outlet mall located on Vineland Avenue in Orlando. As an open -
<br />air complex, one of the critical features was the design of the internal drainage and pedestrian walkway. Additional services for this
<br />W tourist destination entailed a three - quarter -mile extension of Vineland Avenue and master planning for a future timeshare project on the
<br />® property
<br />® Experience prior to joining Kimley -Horn
<br />®
<br />Miami Marlins Park Garages, Miami, FL — As project manager for parking consultation and structural engineering disciplines,
<br />designed four parking garages to serve Marlins Park, the new home of the Miami Marlins Major League Baseball team. The structures
<br />® provide approximately 4,800 parking spaces and also include 60,000 square feet of ground floor commercial and retail space, as well
<br />® as platforms for solar panels.
<br />® Miami Courthouse Garage, Miami, FL — As project manager, assisted with the design of the mixed -use packing facility adjacent to
<br />® the new Federal Courthouse in downtown Miami. Served the owner, the Miami Parking Authority, as prime designer, including parking
<br />® design services for the 850 -space facility. The garage includes two retail spaces on the ground level, as well as more than 20,000
<br />square feet of office space.
<br />® Tampa Port Authority Channelside Garage Expansion, Tampa, FL — As project manager, assisted with the design for this
<br />® essential infrastructure project for the Tampa Port Authority. The Tampa Port Authority Channelside Garage expansion was a complex
<br />design -build project consisting of a five -tier, 720 -space horizontal expansion to an existing garage. The expansion serves the growing
<br />® number of cruise travelers and associated traffic at the port and the Channelside District.
<br />® Britt's Surf-Style Mixed -Use Facility, Clearwater, FL — Served as the city's owner's representative during the design and
<br />® construction of the 300 -space Britt's Surf-Style parking structure. The new mixed -use parking facility contains ground level retail and
<br />® restaurant space. Provided specific design guidelines to include functionality, security, lighting levels, durability, and waterproofing.
<br />® Dadeland Towers Garage Restoration, Miami, FL — As principal -in- charge and project manager, provided condition assessment
<br />® and restoration services for the four - level, 400 space parking structure. Responsible for leading the engineering team production of
<br />® concrete repair and waterproofing specifications and restoration documents to extend the durability of the parking structure.
<br />® Canaveral Port Authority Design -Build Parking Garage, Cape Canaveral, FL — Provided design services for a new 1,000 -space
<br />® parking structure in Cape Canaveral. As a result of a significant increase in cruise ridership, parking demands in the area have risen
<br />® dramatically. The precast parking structure will serve the growing parking needs of the Disney Cruise Line. The structure includes
<br />pedestrian connections to the cruise terminal, as well as a passenger and baggage drop -off area on the ground floor.
<br />® New Jersey Transit Hamilton Station Garage, Hamilton, NJ — As project manager, designed a parking structure to serve the
<br />existing Hamilton Station, located in Hamilton, New Jersey. The six -story, precast parking structure provides 2,066 spaces for transit
<br />® commuters. The facade of the parking structure was designed to complement the existing train station, as well as the historic American
<br />® Standard building located opposite the rail tracks. The design incorporates architectural features similar to the American Standard
<br />® building, such as keystones and cornices, into the stair towers of the parking structure.
<br />® Alfred I. duPont Hospital for Children Parking Garage, Wilmington, DE — As project manager, served as the prime designer for
<br />® a new garage on an existing employee lot. The garage contains 1,800 spaces and includes a precast facade with stone -like features,
<br />® which blend attractively with the rest of the campus. Also developed a courtyard at the main elevator stair tower to provide an inviting
<br />space for employees, giving the facility a warm and inviting atmosphere.
<br />® g- D14d7� Kimley »)Horn
<br />® OY- 0021.14.0 SL,..y1 59 G=.: SeniresFen:re rv0 3-59
<br />
|