|
®
<br />Adrian Dabkowski, P.E., PTOE
<br />®
<br />Transportation Planning/Traffic Engineering,
<br />4
<br />-fn
<br />n
<br />General On -Call Traffic Engineering Services, Fort Lauderdale, FL — Project engineer for
<br />Special Qualifications
<br />general traffic engineering and transportation planning services as part of an on -call contract
<br />■ Has 11 years of traffic/
<br />®
<br />with the City. Kimley -Horn serves as an extension of the City of Fort Lauderdale staff reviewing
<br />transportation engineering
<br />®
<br />traffic impact studies and parking analyses. Projects to date have included peer review of traffic
<br />experience related to
<br />®
<br />impact and parking studies, site plan review, and representation at public hearings. Additional
<br />transportation planning, traffic
<br />projects have included development of a corridor study to support lane reductions along SR
<br />operations, corridor studies,
<br />®
<br />At and development of a Greenways Plan to complement multimodal transportation options
<br />toll road revenue studies,
<br />®
<br />within the corridor.
<br />long -range transportation
<br />OD
<br />improvement plans, access
<br />Resorts World Miami (former Miami Herald site), Miami, FL — Project engineer. Kimley-
<br />management, and alternative
<br />®
<br />Horn is providing site /civil engineering, environmental, and ongoing traffic engineering services
<br />intersection development
<br />®
<br />for the 14 -acre bayfront site that previously housed the Miami Herald newspaper at 1 Herald
<br />■ Proficient in AutoCAD, Highway
<br />Plaza in Miami. The proposed project includes four new hotels with more than 5,000 rooms
<br />Capacity Software (HCS),
<br />and two residential towers featuring up to 1,000 units; a luxury retail galleria; a 3.6 -acre rooftop
<br />Synchro, VISSIM, ArcGISART-
<br />®
<br />lagoon and natural sand beach: more than 50 restaurants, lounges, bars, and nightclubs; a
<br />PLAN, HIGH -PLAN, FREE-
<br />high-tech multimedia entertainment area showcasing the music and culture of Florida and
<br />PLAN, and StreetEVAL
<br />South America; and 700,000 square feet of convention and meeting space. The resort will help
<br />®
<br />develop the three -mile BayWalk, which highlights a 150 -acre leisure and entertainment area
<br />Professional Credentials
<br />®
<br />in downtown Miami. Team tasks include due diligence, parking studies, underground utility
<br />Master of Business Administration,
<br />®
<br />design, preparation of a Special Area Plan (SAP) traffic study consistent with City of Miami 21
<br />Marketing, Rochester Institute of
<br />Zoning Code, environmental site assessment and potential remediation planning, including
<br />Technology
<br />®
<br />contaminant delineation, water quality evaluation, and quarterly groundwater monitoring.
<br />Bachelor of Science, Civil
<br />®
<br />Engineering Technology,
<br />®
<br />Brickell City Centre, Miami, FL — Task manager leading Kimley- Horn's traffic engineering
<br />Rochester Institute of Technology
<br />services for this project. Kimley -Horn prepared a Special Area Plan (SAP) traffic study and
<br />Professional Engineer in Louisiana
<br />®
<br />supporting documentation consistent with City of Miami 21 Zoning Code. Brickell CityCentre
<br />®
<br />is the first project to be approved under the SAP process in the City of Miami. The proposed
<br />Registered Professional Traffic
<br />development includes 830 residential units, a 290 -room hotel, and 906,463 square feet of office
<br />Operations Engineer
<br />®
<br />of which 95,117 square feet will serve as medical office. The development will also include
<br />Professional Organizations
<br />®
<br />535,300 square feet of retail of which 142,000 square feet will serve as entertainment uses
<br />Institute of Transportation
<br />®
<br />such as a nightclub, cinema, and a bowling alley. As part of the traffic engineering services, six
<br />Engineers (ITE)
<br />adjacent traffic signals will be redesigned per the latest Miami -Dade County design standards.
<br />®
<br />Kimley -Horn is also providing civil engineering, roadway design, and transit engineering
<br />®
<br />services for the site.
<br />®
<br />Collins Corner Mixed -Use Development, Miami Beach, FL — Project manager for traffic
<br />®
<br />impact analysis and mechanical parking garage operations for mixed -use redevelopment
<br />®
<br />project consisting of approximately of a 182 - mechancial parking garage, 80 -room hotel, 156-
<br />®
<br />seat quality restaurant, and 10,000 square feet of retail. The project is located east side of
<br />Collins Avenue and 12th Street. The traffic analysis addressed the requirements of the City
<br />®
<br />of Miami Beach for the approval of the project's site plan and included analyses related to the
<br />®
<br />queuing and operations of the mechanical parking garage. Pedestrian improvements were also
<br />recommended.
<br />®
<br />®
<br />Lincoln East Parking Garage (aka 420 Lincoln Road), Miami Beach, FL — Served as
<br />®
<br />project engineer. Kimley -Horn provided traffic engineering and landscape architecture services
<br />Kimley »> Horn
<br />®
<br />RM t<-0@
<br />0Y?W21.14-0 S=y 1s Beare Gov Prof Services Res;rn5iM0
<br />3--60
<br />
|