My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consultants, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
CES Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:26:22 AM
Creation date
8/19/2014 11:26:40 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Owner Agency <br />Miami -Dade Public Works <br />Department <br />Primary Client <br />Miami -Dade County <br />Public Works Department <br />I I I Northwest Is! Street <br />Miami, FL 33128 <br />hit o: / /miomidode.a ov /ou bwork<s <br />Primary Client Contact <br />Octavio Marin, P.E. <br />P:(305)375 -2116 <br />F: (305) 372 -6130 <br />E: ocmCkmiamidade.gov <br />Project Start Date <br />2005 <br />Project End Date <br />2005 <br />Construction Start Date <br />2005 <br />Construction End Date <br />2005 <br />Construction Cost <br />N/A <br />Professional Fees <br />$50,000 <br />Work Types <br />✓ Design <br />✓ MOT <br />✓ <br />Traffic <br />✓ Construction <br />✓ Paving <br />• Inspection <br />• CEI <br />• Construction Oversight <br />lilt <br />— <br />'1 .rau alt <br />hill <br />`- <br />T dezl <br />This project consisted of the reconstruction of all the roadways between <br />SW 127th Avenue and SW 132nd Avenue, and between SW 72nd Street <br />and SW 75h Street. CES was responsible for construction inspection <br />services as follows: <br />✓ Installation of drainage box structures <br />✓ Installation of catch basins <br />✓ Construction of new sidewalks, driveways, curbs and ADA <br />access ramps <br />• Raising and /or resetting of manholes <br />• MOT Compliance <br />✓ New sub -base and asphalt pavement <br />✓ Removal / replacement of fences <br />In addition to overseeing the work designed by other design <br />consultants, our staff directed the contractor's operations and <br />coordinated all project activities with the Miami -Dade Public Works <br />project manager and prepared inspector daily reports that were used <br />as a basis for payment to the contractor. <br />All work performed by the contractor was monitored to ensure strict <br />compliance with local, state, and federal standards and guidelines. <br />All work performed by the contractor was monitored to ensure strict <br />compliance with local, state, and federal standards and guidelines. <br />fdfd All work performed by the contractor was monitored to ensure <br />strict compliance with local, state, and federal standards and <br />guidelines. <br />City of Sunny Isles Beach 12 <br />Con riming .'roiessionol Services for c "ngireering <br />.4FQ No. 14-07-02 <br />Augus7 12. 2014 vc <br />
The URL can be used to link to this page
Your browser does not support the video tag.