Laserfiche WebLink
Owner Agency <br />Miami -Dade `Hater & <br />Sewer Department <br />Primary Client <br />Hazen and Sawyer <br />999 Ponce de Leon Blvd <br />Suite 1150 <br />Coral Gables, FL 33134 <br />hitp: / /hozenandsow er.com <br />Primary Client Contact <br />Jayson Page, P.E. <br />P:954- 734 -0875 <br />E: ipaoe hazenondsawver.com <br />Project Start Date <br />2008 <br />Project End Date <br />2009 <br />Professional Fees <br />$1,400.000 <br />Work Types <br />• Energy <br />• Permitting <br />• Design <br />• Geotechnical <br />• Water & Sewer <br />• Planning <br />• Cost Estimating <br />• Infrastructure <br />CES provided engineering design services to Miami -Dade County in an <br />effort to develop remedial actions plans (RAPS( to bring over 350 pump <br />stations up to energy efficiency standards and operating compliance. <br />The recommended upgrades ensured compliance with the 10 -hour run <br />time per day limit. The development of this energy efficiency plan also <br />incorporated the projected flows of these water pumps through the <br />2030 planning horizon. <br />The purpose of this task was to evaluate all aspects of the pump station, <br />identify deficiencies, and provide energy efficiency recommendations <br />in order to increase the critical station capacity and reduce pump run <br />times below the 10 -hour per day limit. The recommended <br />improvements for individual pump stations would then be evaluated on <br />a system -wide basis. <br />CES was specifically responsible <br />for the following aspects of the <br />wASD Energy Efficiency Master <br />Plan: <br />Lift Station Design <br />Improvements <br />Data Collection (run <br />time, pump station <br />maintenance histories. <br />motor and pumping <br />systems, and gravity <br />collection and force main systems( <br />Modeling process and analysis for the force main systems <br />Pump capacity /system curves <br />Energy Efficiency Plan development (including impeller change - <br />out, pump speed- increase, pump unit replacement, force main <br />improvements, and pump station replacement( <br />Capital needs for improvement <br />The modified pump capacity /system curves served as the basis for <br />developing recommendations regarding the pumping units and <br />discharge system to meet the planned flow conditions. A cost analysis <br />for the deficient pump stations was also provided in the report. The <br />recommended improvements for individuals pump stations were <br />subsequently evaluated on a system -wide basis. <br />City of Sunny Isles Beach 13 <br />Continuing =rotessional Services for engineering <br />R.FO No. 1 � -07 -02 <br />August 12, 2014 o�. +:a.�.;�.ac. <br />