Laserfiche WebLink
Owner Agency <br />City of Miramar <br />Department of <br />Operational Services <br />Primary Client <br />P3S &J (now Atkins) <br />2001 Northwest 107th Ave <br />Miami, : L 33172 <br />n:: o / /nor: nomerico.c: k V uclooal.com <br />Primary Client Contact <br />Roberto S. Ortiz, P.E. <br />P:(305) 704 -4429 <br />;:(305)418 -4924 <br />E: rortiz @brwncals.com <br />Project Start Date <br />2006 <br />Project End Date <br />2007 <br />Construction Start Date <br />2007 <br />Construction End Date <br />2009 <br />Construction Cost <br />$12,000.000 <br />Professional Fees <br />$170,000 <br />Work Types <br />• Utilities <br />• Residential <br />• Infrastructure <br />• Water & Sewer <br />• Design <br />• Sidewalks <br />• Construction <br />• Roadways <br />• Construction <br />Administration <br />The City of Miramar is ranked among the top ten fastest- growing cities <br />in the United States. This growth necessitated implementing major <br />infrastructure improvements in the eastern section of the City, which is <br />over 50 years old. The project area perimeter included Miramar <br />Parkway on the north, State Road 7 on the east, County Line Road on <br />the south, and SW 64th Avenue on the west, all of which encompassed <br />a total of 52 roadway segments. <br />Approximately 5 miles of water mains were upgraded to 6- and 8 -inch <br />DIP, and approximately 5 miles of gravity sewer were constructed <br />throughout the area. This commensurate increase in flow warranted <br />the upgrade of a local pump siation as well. The pump station received <br />new pumps, a new wet well, and an updated electrical panel. <br />CES provided engineering <br />engineering and inspection <br />installation of the following: <br />Design <br />• Newwaterdismbutionmoins <br />• Construction of sanitary sewers <br />• Installation of drainage <br />design services and construction <br />services during the construction and <br />New sidewalk construction including <br />ADA compliance <br />Pump station construction <br />Roadway resurfacing and /or <br />reconstruction <br />Signage and street markings <br />Construction <br />Coordination of construction <br />activities <br />V Contract administration support <br />Progress payment review and <br />opproval <br />• Pcnicipotion in progress meetings <br />• .Responses to all requests for <br />information <br />✓ Interfacing with the design <br />consultant to address field changes <br />Coordination between engineers. <br />city staff, and the contractor <br />Co Be <br />of Sunny Isles Bach 14 �� <br />Continuing Prores,siottcl zervicez for Engineedrg <br />R: O No. 14 -07 -02 <br />August 12, 2014 01`11;1c5 ac <br />