Laserfiche WebLink
Owner Agency <br />The City of Opa -L ocka <br />Primary Client <br />PBS &J (now Atkins) <br />2001 Northwest 1071^ Ave <br />Miami. FL 33172 <br />n::n: / /np:hemerica aai�sabbalcom <br />Primary Client Contact <br />Christopher A. Niforatos, <br />P.E. <br />P: (813) 876 -6800 <br />F: (813) 876 -6700 <br />E: niforatoscaChalcrow.com <br />Project Start Date <br />2004 <br />Project End Date <br />2006 <br />Construction Start Date <br />2004 <br />Construction End Date <br />2005 <br />Construction Cost <br />$10,000,000 <br />Construction Cost <br />$100.000 <br />Work Types <br />• CEI <br />• Inspection <br />• water & Sewer <br />• FEMA <br />• Cost Estimating <br />• Scheduling <br />CES provided construction <br />engineering and inspection services to 1 <br />the City of Opa -Locko as part of the <br />:y <br />City's storm wafer mitigation program. - - <br />The City of Opa -Locko had - - <br />experienced severe flooding ✓ fir. J <br />throughout its residential and ='• <br />commercial business districts for many <br />years, stemming primarily from its <br />geographic location and the lack of a ' <br />regularly scheduled canal cleanup <br />plan, preventive maintenance schedule, or coordination to develop <br />realistic timetables to complete all projects related to flood protection. <br />With funds provided by FEMA and the Florida Department of <br />Environmental Protection (FDEP), the City of Opa -Locka hired a <br />consultant to develop a program to mitigate the flooding problems <br />faced by the City. <br />As a sub - consultant to the prime firm, CES was responsible for the <br />construction engineering and inspection services overseeing the <br />activities performed by the contractor for the following: <br />✓ Canal cleaning and dredging <br />✓ Installation of Filter Fabric & Geoweb <br />• Canal stabilization material <br />• Installation of rip -rap <br />• Cost estimating <br />• Primavera Scheduling <br />In addition to providing inspection services, CES provided contract <br />administration support, reviewed and approved progress payments, <br />participated in monthly construction progress meetings, and assisted <br />the City with preparation of reports to be submitted to FEMA. <br />Co of Sunny Isles Beach 16 <br />Continuing Professional Services for engineering <br />= Q No. 14 -07 -02 <br />august 12.2014 C1)v1¢c11T5 mL. <br />