Laserfiche WebLink
Rudy M. Ortiz, PE, CGC <br />Principal in Charge <br />Mr. Ortiz has over 25 years of design and management experience <br />in a variety of civil engineering areas, specializing in the design and <br />construction management of neighborhood improvement projects and <br />water /wastewater facilities. Mr. Ortiz's experience also includes Program <br />Management of fast -track and complex water and wastewater projects, <br />including Consent Decree programs for Miami -Dade County and Puerto <br />Rico. <br />Key Projects <br />East Miramar Redevelopment <br />Transmission L Distribution Water Main <br />Improvements, Phase 3 (Bid Package 1 <br />ALB) <br />Miramar, Florida <br />Provided technical advice in <br />providing engineering analysis and <br />design services for the upgrade of <br />approximately 72,000 L.F. of water <br />main. The project consisted of <br />upgrading existing 2 -inch and 4 -inch <br />residential water main to a 6, 8, and <br />12 -inch water main. This effort will <br />improve pressure and provide fire <br />protection within the area. Towards <br />the middle of the design, the City <br />requested to reevaluate the design <br />in an effort to create 3 to 4 smaller <br />packages for bidding. CES staff <br />worked closely with City staff to <br />redesign the project and create 3 <br />smaller bid packages that can be <br />independently functional from the <br />other bid packages. Bid package 2 <br />had a total of 25,090 L.F., including <br />a directionally drilled 8 -inch Ductile <br />Iron Pipe section of 120 L.F. main. <br />The team creation of smaller bid <br />packages provided the client with <br />a phasing that fulfilled their needs <br />while reducing the initial capital cost <br />required by the entire 72,000 L.F. <br />East Miramar Redevelopment <br />Transmission L Distribution Water Main <br />Improvements, Phase 3 (Bid Package 3 <br />ALB) <br />Miramar, Florida <br />Provided technical advice in <br />providing engineering analysis and <br />design services for the upgrade of <br />approximately 72,000 L.F. of water <br />main. The project consisted of <br />upgrading existing 2 -inch and 4 -inch <br />residential water main to a 6, 8, and <br />City of Sunny Isles Beach 22 <br />Conrir,uing Professional Services for Engineenng <br />RFa No. 14 -07 -02 <br />Augusi 12, 2014 <br />12 -inch water main. This effort will <br />improve pressure and provide fire <br />protection within the area. Towards <br />the middle of the design, the City <br />requested to reevaluate the design <br />in an effort to create 3 to 4 smaller <br />packages for bidding. CES staff <br />worked closely with City staff to <br />redesign the project and create 3 <br />smaller bid packages that can be <br />independently functional from the <br />other bid packages. Bid package 2 <br />had a total of 21,160 L.F., including <br />a directionally drilled 8 -inch Ductile <br />Iron Pipe section of 120 L.F. main. <br />The team creation of smaller bid <br />packages provided the client with <br />a phasing that fulfilled their needs <br />while reducing the initial capital cost <br />required by the entire 72,000 L.F. <br />Miramar Roadway Infrastructure Project <br />City o; Miramar, Florida <br />Enhanced staff's efforts by providing <br />valuable technical knowledge on <br />constructability of the design of <br />over 5 miles of water main, 5 miles <br />of sewer, 5 miles of drainage, and <br />sanitary sewer lift station upgrades. <br />Additionally, performed and <br />managed monitoring efforts for <br />construction activities throughout <br />the southern half of the City. <br />Design of 2,200 LF of 8-inch Residential <br />Water Main <br />Ciiy of Coral Gables, FL <br />Assisted the team during the <br />engineering analysis and design <br />services for the upgrade of <br />approximately 2,200 L.F. of water <br />main for the Miami -Dade County <br />Water and sewer Department. The <br />project consisted of designing a <br />residential 8 -inch water main along <br />C 0)— <br />