My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consultants, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
CES Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:26:22 AM
Creation date
8/19/2014 11:26:40 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
main which is very old and runs in an <br />easement behind the properties. <br />E06- WASD -09; Task Order No. 2: Design <br />of 1,800 LF of 8 -inch Residential Water <br />Main <br />City of n,tiomi, Florida <br />As project manager, lead the project <br />team in providing engineering <br />analysis and design services for <br />the upgrade of approximately <br />1,800 L.F. of water main for WASD. <br />The project consisted of designing <br />several segments of residential <br />8 -inch water main at NE 13 Court <br />and NW 13 Place from NE 199 <br />Street to North Drive within the <br />City of Miami. This project would <br />provide the neighborhood with <br />fire protection, as well as, allowing <br />WASD with the ability to abandon <br />the existing water main which is very <br />old and runs in an easement behind <br />the properties. Additionally, he was <br />directly involved with the permitting, <br />particularly with the City of Miami <br />Public Works Department and the <br />Fire Department. <br />E06- WASD -09; Task Order No. 3: Design <br />of 5,800 LF of 8 -inch Residential Water <br />Main <br />City of ,Miami, FL <br />As projectmonager, lead the project <br />team in providing engineering <br />analysis and design services for the <br />upgrade of approximately 5,800 L.F. <br />of water main for WASD. The project <br />consisted of designing several <br />long segments of residential 8 -inch <br />water main along SW 64 Avenue, <br />SW 63Court, and SW 63 Avenue <br />from SW 4 Street to stub -outs near <br />SW 8 Street. This project would <br />provide the neighborhood with <br />fire protection, as well as, allowing <br />WASD with the ability to abandon <br />the existing water main which is very <br />old and runs in an easement behind <br />the properties. Additionally, he was <br />directly involved with the permitting, <br />particularly with the City of Miami <br />Public Works Department and the <br />Fire Department. <br />E01- WASD -05B; Design of 4,000 LF of <br />8 -inch Residential Water Main <br />City of ,Miami, Florida <br />As project manager, lead the project <br />team in providing engineering <br />City of Sunny Isles Beach 25 <br />Continuing ?roiessioncl Services for Engineering <br />B. °a Na 14 -07-02 <br />August 12. 2014 <br />analysis and design services for the <br />upgrade of approximately 5,800 L.F. <br />of water main for WASD. The project <br />consisted of designing several <br />long segments of residential 8 -inch <br />water main along SW 64 Avenue, <br />SW 63Courf, and SW 63 Avenue <br />from SW 4 Street to stub -outs near <br />SW 8 Street. This project would <br />provide the neighborhood with <br />fire protection, as well as, allowing <br />WASD with the ability to abandon <br />the existing water main which is very <br />old and runs in an easement behind <br />the properties. Additionally, he was <br />directly involved with the permitting, <br />particularly with the City of Miami <br />Public Works Department and the <br />Fire Department. <br />Fort Lauderdale Waterworks 2011 <br />Project <br />Fort Lauderdale, Florida <br />Provided project management of <br />the inspection staff in the construction <br />of the above referenced project. <br />The project consisted of upgrading <br />the water, sewer, and drainage <br />systems through various locations <br />within the City of Fort Lauderdale. <br />He verified the construction quantity <br />and quality of several miles of water <br />and sewer pipelines. <br />E06- WASD -09; Task Order No. 4: Design <br />of 1,900 LF of Force Main Design <br />Miami -Dade County, Florida <br />As project manager, lead the project <br />team in providing engineering <br />analysis and design services for the <br />upgrade of approximately 1,900 <br />L.F. of 8 -inch DIP force main for the <br />WASD. The project consisted of <br />designing an 8 -inch force main that <br />will alleviate the current constraints <br />of the area, and allow for future <br />growth. <br />E06- WASD -09; Task Order No. 5: Design <br />of 1,900 LF of Force Main Design <br />Miami -Dade County, Florido <br />Engineer of Record for the design <br />of approximately 5,700 L.F. of 8 -inch <br />and 10 -inch DIP force main for the <br />WASD. The project consisted of <br />designing an 8 -inch force main that <br />will alleviate current constraints of <br />the area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.