|
0
<br />0
<br />0
<br />0
<br />0
<br />0
<br />0
<br />0
<br />0
<br />0
<br />0
<br />0
<br />0
<br />0
<br />0
<br />0
<br />Miller Legg included: establishment
<br />of the wetland jurisdictional lines,
<br />verification of those jurisdictional
<br />lines with applicable regulatory
<br />agencies, provided environmental
<br />resource permitting support,
<br />prepared a Wetland Impact Report,
<br />assessed secondary wetland
<br />impacts associated with operation
<br />of the basin, development of a
<br />wetland monitoring plan, collection
<br />of baseline wetland data, pre and
<br />post -WRAP analyses, and hydrologic
<br />influences. Miller Legg developed a
<br />wetland monitoring plan to assess
<br />secondary impacts over five years.
<br />Miscellaneous Engineering Services
<br />South Florida Water Management District
<br />Through a three -year contract,
<br />provided miscellaneous engineering
<br />consulting support services to the
<br />South Florida Water Management
<br />District. Services included: civil
<br />engineering, structural engineering,
<br />water resources engineering,
<br />mechanical, geotechnical and
<br />environmental engineering. Other
<br />services provided or managed
<br />under this contract included:
<br />architectural, land surveying,
<br />electrical engineering, landscape
<br />architecture, emergency
<br />management and engineering
<br />economic studies.
<br />Miscellaneous Environmental
<br />Engineering Support CERP Contract
<br />South Florida Water Management District
<br />Provided miscellaneous
<br />environmental consulting support
<br />services to the South Florida Water
<br />Management District for the CERP
<br />project including wildlife surveys and
<br />identification, wetlands evaluations,
<br />geographic information systems
<br />(GIS) /remote sensing, National
<br />Environmental Policy Act (NEPA)
<br />compliance assistance, wetland
<br />jurisdictional analysis, environmental
<br />permitting and threatened and
<br />endangered species services.
<br />Additional services included: civil
<br />engineering, structural engineering,
<br />water resources engineering,
<br />mechanical, geotechnical and
<br />environmental engineering,
<br />architectural, land surveying,
<br />City of Sunny Isles Beach 32
<br />Continuing ?rofessionel Services for Engineering
<br />.R.=O No. 1' -07 -02
<br />August 12, 2014
<br />electrical engineering, landscape
<br />architecture, emergency
<br />management and engineering
<br />economic studies.
<br />West Lake Park II Environmental
<br />Broward County Parks and Recreation
<br />Miller Legg is prime consultant
<br />for the permitting and design of
<br />enhancements forthe second phase
<br />of this 1,500 -acre estuarine wetland.
<br />Services provided included: paving
<br />and drainage improvements for
<br />the nature center and associated
<br />parking lot, design of three sewage
<br />pump stations, water distribution
<br />system design, sanitary sewage
<br />collection and transmission system
<br />design, off -site force main, traffic
<br />engineering, surveying, water
<br />quality data analysis, hypothesis
<br />development and review, sediment
<br />analysis, fishery analysis, rip -rap
<br />design, benthic macro- invertebrate
<br />identification, seagrass survey,
<br />mitigation credit determination, and
<br />permitting with the US Army Corps
<br />of Engineers, Florida Department
<br />of Environmental Protection, South
<br />Florida Water Management District,
<br />and Broward County Environmental
<br />Protection Department. Additional
<br />specific services included
<br />mangrove trimming oversight,
<br />soil disposal coordination and
<br />administration, regulated water
<br />management, environmental
<br />creation area e- permit compliance,
<br />mangrove wetland construction
<br />administration, saltmarsh and
<br />tidal upland habitat restoration
<br />and planting (over 63,000 plants)
<br />review and administration, scientific
<br />monitoring for biological habitat
<br />function and permit compliance,
<br />wetland maintenance review and
<br />administration, construction grading
<br />and creation of habitat review and
<br />administration, rip rap and marine
<br />wetland protection construction
<br />review and administration,
<br />environmental protection /
<br />monitoring, protected species
<br />(wildlife and plants) observation and
<br />compliance / avoidance during
<br />construction, seagrass monitoring
<br />during construction and SWPP.
<br />Co llaAlD in .
<br />
|