Ranthus B. Fouch, PE
<br />Grant Writing Assistance
<br />Mr. Fouch has over 40 years of experience with responsibilities including
<br />client service, design and engineering, planning, construction services,
<br />project delivery, and quality assurance. Mr. Fouch has worked with clients
<br />including Hollywood, Broward County Water and Wastewater Services,
<br />Sunrise, Miramar, South Florida Water Management District, West Palm
<br />Beach, Palm Beach County Water Utilities Department, North Miami Beach,
<br />North Miami, Miami Dade Water and Sewer Department, Department of
<br />the Navy, and the Department of the Army.
<br />Mr. Fouch is experienced in a wide -range of water supply distribution
<br />and treatment facilities, and wastewater infrastructure, including water
<br />distribution and transmission pipelines, pipeline rehabilitation, hydraulic
<br />modelling, water and wastewater pumping stations, storage facilities, and
<br />wastewater collection and transmission.
<br />Key Projects
<br />Distribution System Operational
<br />Practices Manual Update
<br />Miami -Dade County Warer and Sewer
<br />Department, FL
<br />Principal Engineer Development
<br />of the update to the Water
<br />Distribution Division's Operations
<br />and Maintenance Manual for the
<br />Water Distribution System.
<br />36 -inch Transmission Pipe - Phase I WTP
<br />Improvements
<br />Ciry of west Palm Beach, FL
<br />Principal Engineer Design of
<br />improvements during construction
<br />for the Phase I improvements
<br />to the 47 MGD Clear Lake WTP
<br />for conversion of the plant from
<br />high pH softening to enhanced
<br />coagulation. Engineering services
<br />during construction included design
<br />of modifications to 24 to 36 -inch
<br />piping for water transmission within
<br />the WTP.
<br />72/60 -inch Spot Pond Pipeline
<br />Massachusetts V later Resources
<br />A.uthoriry (M'NRAf, Boston, MA.
<br />Principal Engineer Design of
<br />improvements for the Spot Pond
<br />pipeline consisting of over 16,000
<br />feet of 48 -inch, 60 -inch, and 72 -inch
<br />diameter water mains, analysis of
<br />alternative pipeline, tunnel routings,
<br />coordination with four communities,
<br />potentially sensitive historical area,
<br />and extremely congested roadways
<br />and residential neighborhoods.
<br />City or Sunny Isles Beach 38
<br />Continuing Professioncl services for - ngineenng
<br />3Fa No. Ie -07 -02
<br />August 12, 2014
<br />Water Reuse Pipeline
<br />City or Sunrise, FL
<br />Principal Engineer Routing analysis,
<br />basis of design and hydraulic
<br />criteria, final design, and permitting
<br />for 4,100 feet of 24 -inch Ductile Iron
<br />and HDPE piping with 750 feet of
<br />directional drilling for the pipeline
<br />under a canal.
<br />Basis of Design Report - 60 -inch and 48-
<br />inch Pipe for 2A WTP Interim Disinfection
<br />Solution
<br />Brov/ard Counry WWS, FL
<br />Principal Engineer Conceptual
<br />design of 350 LF of 60 -inch, and
<br />450 LF of 48 -inch transmission
<br />pipe for disinfection infrastructure
<br />improvement options for the
<br />County's Water Treatment Plant
<br />2A to provide half of the 4 -log virus
<br />reduction required by the Florida
<br />Administrative Code (FAC) 62-
<br />555.320(12)(b) for ground water
<br />systems ( "Bird Rule ").
<br />48 -inch WASM 3 to Shaft 7 Connecting
<br />Main
<br />MVVRA, 3osion, MA.
<br />Principal Engineer Routing study
<br />and design for 50,000 feet of High
<br />Service water main to connect an
<br />improved Cochituate Aqueduct
<br />near Shaft 7 with WASM 3, including
<br />connections to local communities,
<br />and rehabilitation of 16,400 feet of
<br />24/36 -inch water main.
<br />�u_
<br />
|