Laserfiche WebLink
Ranthus B. Fouch, PE <br />Grant Writing Assistance <br />Mr. Fouch has over 40 years of experience with responsibilities including <br />client service, design and engineering, planning, construction services, <br />project delivery, and quality assurance. Mr. Fouch has worked with clients <br />including Hollywood, Broward County Water and Wastewater Services, <br />Sunrise, Miramar, South Florida Water Management District, West Palm <br />Beach, Palm Beach County Water Utilities Department, North Miami Beach, <br />North Miami, Miami Dade Water and Sewer Department, Department of <br />the Navy, and the Department of the Army. <br />Mr. Fouch is experienced in a wide -range of water supply distribution <br />and treatment facilities, and wastewater infrastructure, including water <br />distribution and transmission pipelines, pipeline rehabilitation, hydraulic <br />modelling, water and wastewater pumping stations, storage facilities, and <br />wastewater collection and transmission. <br />Key Projects <br />Distribution System Operational <br />Practices Manual Update <br />Miami -Dade County Warer and Sewer <br />Department, FL <br />Principal Engineer Development <br />of the update to the Water <br />Distribution Division's Operations <br />and Maintenance Manual for the <br />Water Distribution System. <br />36 -inch Transmission Pipe - Phase I WTP <br />Improvements <br />Ciry of west Palm Beach, FL <br />Principal Engineer Design of <br />improvements during construction <br />for the Phase I improvements <br />to the 47 MGD Clear Lake WTP <br />for conversion of the plant from <br />high pH softening to enhanced <br />coagulation. Engineering services <br />during construction included design <br />of modifications to 24 to 36 -inch <br />piping for water transmission within <br />the WTP. <br />72/60 -inch Spot Pond Pipeline <br />Massachusetts V later Resources <br />A.uthoriry (M'NRAf, Boston, MA. <br />Principal Engineer Design of <br />improvements for the Spot Pond <br />pipeline consisting of over 16,000 <br />feet of 48 -inch, 60 -inch, and 72 -inch <br />diameter water mains, analysis of <br />alternative pipeline, tunnel routings, <br />coordination with four communities, <br />potentially sensitive historical area, <br />and extremely congested roadways <br />and residential neighborhoods. <br />City or Sunny Isles Beach 38 <br />Continuing Professioncl services for - ngineenng <br />3Fa No. Ie -07 -02 <br />August 12, 2014 <br />Water Reuse Pipeline <br />City or Sunrise, FL <br />Principal Engineer Routing analysis, <br />basis of design and hydraulic <br />criteria, final design, and permitting <br />for 4,100 feet of 24 -inch Ductile Iron <br />and HDPE piping with 750 feet of <br />directional drilling for the pipeline <br />under a canal. <br />Basis of Design Report - 60 -inch and 48- <br />inch Pipe for 2A WTP Interim Disinfection <br />Solution <br />Brov/ard Counry WWS, FL <br />Principal Engineer Conceptual <br />design of 350 LF of 60 -inch, and <br />450 LF of 48 -inch transmission <br />pipe for disinfection infrastructure <br />improvement options for the <br />County's Water Treatment Plant <br />2A to provide half of the 4 -log virus <br />reduction required by the Florida <br />Administrative Code (FAC) 62- <br />555.320(12)(b) for ground water <br />systems ( "Bird Rule "). <br />48 -inch WASM 3 to Shaft 7 Connecting <br />Main <br />MVVRA, 3osion, MA. <br />Principal Engineer Routing study <br />and design for 50,000 feet of High <br />Service water main to connect an <br />improved Cochituate Aqueduct <br />near Shaft 7 with WASM 3, including <br />connections to local communities, <br />and rehabilitation of 16,400 feet of <br />24/36 -inch water main. <br />�u_ <br />