My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consultants, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
CES Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:26:22 AM
Creation date
8/19/2014 11:26:40 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Design of 9,800 LF of Residential Water <br />Mains <br />Miomi -Dade WASD, FL <br />Principal Engineer Principal Engineer <br />for the engineering analysis <br />and design services to upgrade <br />approximately 9,800 LF of water <br />main. The project consisted of <br />designing a residential 8 -inch water <br />main within several dense residential <br />areas of the County. The project <br />will provide the neighborhoods <br />with improved pressures and fire <br />protection. <br />Design of 17,700 LF of Force Main <br />Improvements <br />Miami -Dade County WASD, FL <br />Principal Engineer Principal Engineer <br />for engineering analysis and design <br />services for the replacement of <br />approximately 17,700 LF of asbestos - <br />cement pipe force mains with 8, <br />10, and 12 -inch DIP force mains <br />located within dense residential <br />neighborhoods of the County. The <br />project will alleviate the current <br />constraints of the area, and allow <br />for future growth. <br />Raw Water Pipeline for Floridan Wells <br />Ciry of Sunrise, FL <br />Principal Engineer Routing analysis, <br />basis of design and hydraulic criteria, <br />final design, and permitting for 7,000 <br />feet of 24 -inch PVC and HDPE piping <br />with 750 feet of directional drilling for <br />the pipeline under a canal. <br />Distribution System Hydraulic Modeling <br />Palm Beach County Walter Uidiiie_ <br />Dept., FL <br />Principal Engineer Updating of the <br />PBCWUD water, reuse, and force <br />main hydraulic models, conducting <br />analyses of various hydraulic <br />scenarios, orientation of PBCWUD <br />operations personnel in the <br />model operation; troubleshooting <br />distribution system problems. <br />Sunrise Boulevard. <br />36 -inch Gravity Sewer Cummingsville <br />Branch Sewer Facilities Plan <br />m WRA, Bosion, MA. <br />Principal Engineer Planning level <br />study, BODR, and recommendations <br />for improvement of the <br />Cummingsville Branch System that <br />receives wastewater from sections <br />of three urban communities, <br />recommended improvements <br />involved approximately 5,000 linear <br />feet of new 36 -inch gravity sewer <br />replacement. <br />42 -inch WTP Discharge Pipe Basis of <br />Design Report and 30 -inch WTP Raw <br />Water Meter Improvements <br />City of 'ollywood, FL <br />Principal Engineer Design, permitting, <br />and construction services for new <br />raw water meters on the 30 -inch <br />pipe from the Biscayne wells, and <br />BODR for modifications to 42 -inch <br />finished water pumping discharge <br />pipe. <br />Water Distribution System Hydraulic and <br />Water Quality Model <br />3osion V later and Sewer Commission <br />(BWSC(, 3osion, MA, <br />Principal Engineer Development of <br />a hydraulic and water quality model <br />of the BWSC water distribution <br />system that interfaces with the <br />Commission's Infrastructure GIS <br />program, and includes over 15,000 <br />pipe segments and provides the <br />ability to model extended period <br />simulations (EPS) and water quality <br />changes. <br />Automated Meter Reading Pilot Study <br />Miami -Dade County WASD, FL <br />Technical Advisor Technical advisor <br />for study of application of AMR <br />technology, and field application <br />planning. <br />C12 /C13 Canals 48 -inch Pipe <br />Interconnect Micro - tunneling <br />Broward County WWS, FL <br />Project Manager Principal Engineer <br />for the pipe routing, design, and <br />permitting for the 48 -inch concrete <br />pipe interconnect between the C12 <br />and C13 canals, including a 175 - <br />foot micro - tunneling segment under <br />City or Sunny Isles Beach 39 <br />Continuing rofessioncl Services for Engineenng <br />R -0 <br />°Q No. Id 7 -02 <br />August 12, 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.