My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consultants, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
CES Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:26:22 AM
Creation date
8/19/2014 11:26:40 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Freddy Mena, El <br />Drafting <br />Key Experience <br />Project Engineer: <br />Met & coordinated with clients/ <br />owners of properties within scope <br />of work. <br />• Wrote & sent RFIs, Submittals, & <br />Purchase Orders. <br />• Reviewed Contract documents, <br />Plans & Specifications for <br />designated projects. <br />• Calculated quantities of <br />materials used for construction <br />projects. <br />• Contacted & coordinated with <br />subcontractors & suppliers. <br />• Revised quotes and contracts <br />from subcontractors & suppliers <br />for scope of work. <br />• Read and used survey reports to <br />calculate area and volume for <br />excavation, dredging, etc. <br />• Drafted shop drawings for <br />internal use and client submittals <br />Quality Control Manager: <br />• Documented Daily Reports of <br />on -site activity. <br />• Reviewed Daily Reports & <br />performed QC analysis before <br />documenting and sending to <br />on -site inspector. <br />• Visited job sites to verify general <br />safety and quality of work. <br />• Revised weekly expenses & <br />payroll for correct amounts & <br />allocation of funds. <br />Estimating (Training): <br />• Trained and worked closely <br />with estimator to create bids for <br />prospective projects. <br />• Learned the use of RSMeans & <br />estimating software. <br />Project Management (Training): <br />Worked closely with project <br />manager to compile information <br />& reports on designated projects. <br />City of Sunny Isles Beach 42 <br />Confinuing ?rofessioncl Services for cngineenng <br />RFQ No. I4 -07 -02 <br />August 12. 2014 <br />• Analyzed scheduling, lead time <br />for products & materials, labor, <br />and project budgets & costs. <br />• Compiled reports for budget/ <br />cost to analyze variances and <br />discrepancies in estimates. <br />Outside -Plant Engineering: <br />• Drafted & Designed placement <br />of new pole structures, <br />maintenance on aerial facilities, <br />placement & maintenance of <br />subsurface facilities. <br />• Generated reports of designs for <br />budgeting & cost assessment. <br />• Drafted permits for proposed <br />construction done on and off <br />roadways. <br />• Assessed discrepancies between <br />designs for maintenance & <br />placement of additional facilities <br />with schematic, as- built's and <br />conduit plats. <br />• Coordinated with several <br />municipalities for boring and <br />trenching permits needed for <br />construction done within their <br />respective right -of -ways. <br />c0 <br />n +sunvs.ISC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.