My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consultants, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
CES Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:26:22 AM
Creation date
8/19/2014 11:26:40 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RAFAEL J. BALLESTEROS P.E.. P.A. <br />CONSULTANTS. ENGINEERS & PLANNERS <br />Bus: 305- 823 -7343 Cell: 305- 753.2605 <br />E -mail: Rafaeljuanb(daol.com <br />Ref; CES Consultants, Inc. April 3, 2008 <br />To Whom It May Concern: <br />Key team members of the CES team have a long standing and established relationship working with the Miami -Dade <br />Water and Sewer Department. <br />One of my duties on Miami Dade Water and Sewer Department was Project Manager of the Need Assessment <br />Program (NAP) and General Obligation Bond (GOB). <br />The scope of work consists in; <br />• Prepare Basis of Design Report which will include an overview of the existing facilities, recommendations for <br />improvements, list of permits and approvals required for permitting agencies and a schedule for completing <br />project tasks of project. <br />• Prepare design plans and Construction Bid Documents according to the MDWASD and Dade County rules, <br />regulations and requirements of the permitting agencies with jurisdiction over the project. <br />• Provide construction administration services for the project limited to attending pre -bid, pre-clarification and <br />pre - construction meeting with WASD forces, review shop drawings, help the PM and/or WASD answering <br />RFI's and change order request. <br />The CES design team was always vigilant in meeting our requests throughout every phase of WASD projects. <br />On behalf of my experience with CES, I will like to note the expertise level exhibited by CES. I am pleased to <br />recommend CES for additional design, construction management and inspection services project related work. <br />I recently retired from Miami Dade Water and Sewer Department. Please feel free to contact me for any additional <br />information. <br />Sincerely <br />Rafael J. Ballesteros, P.E. <br />City of Sunny Isles Beach jb r� <br />Continuing 07-02 Professional Services for Engineering <br />Aug No. 14 -07 -0� cu, =�n: +tea -mac. <br />.RFO August 12, 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.