My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consultants, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(14-07-02) Continuing Professional Architectural and Engineering Services - Individulas Only CCNA
>
Responses
>
CES Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 11:26:22 AM
Creation date
8/19/2014 11:26:40 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Continuing Professional Services for Architectural, Landsc.
Bid No. (xx-xx-xx)
14-07-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MIAMI -DADE COUNTY, FLORIDA <br />MIAME Capital Improvements Information System <br />Public Works Department <br />Project Evaluation <br />Evaluation Type: Standard Evatuation <br />Contract E01- PW-05, E-04 Work Order No: N/A <br />Contract Consultants for General Engineering Design and Management to Act as a Master Consultant for the <br />Name: Development of an Infrastructure Comprehensive Plan Incorporating All County Assets and Projects including <br />FEMA <br />Award <br />Contact: Lissett Cabrera <br />Amount: <br />� Ol)000000 <br />(305) 3754720 <br />Contract <br />PSA <br />Type: <br />Contractor / <br />Consultant <br />CES Consultants, Inc. <br />FEIN: 650792884 <br />Evaluator ID: kopp Date: 6/14/2007 Period: Project conclusion or closeout <br />RafiIng <br />®I <br />0� <br />Cntena <br />Schedule - Quality of schedule & adherence to schedule <br />U-11-11-11—Mcommunity. <br />resulting in timeliness and minimizing delay to the owner and <br />1 <br />= <br />= <br />= <br />=� <br />Cost effectiveness &effciency - Budget compliance 8 value of <br />ork. <br />3000 <br />= <br />=F__,/_J <br />Ision - Design - Concepts or adherence to criteria. <br />�a�� <br />=� <br />Cooperation - Teamwork &relationship with owner, subs and <br />su Hers. <br />=71F1F_T';'_1 <br />Coordination - Ability to organize, schedule and complete <br />tasks in adherence to the schedule. <br />uracy & Technical Skills - Cost estimating, scheduling, <br />r—IFIFT-11—IM5ournentation <br />p and other drawings, Plans. manuals, Project <br />and conflict resolution. <br />��jj <br />=� <br />Completeness - Compliance with contract documents, <br />u��� <br />permits, Codes & standards. <br />f_T_"'_1F__1F__1a= <br />Responsiveness - Gear & concise responses to owner <br />comments and correspondence. <br />respon <br />9�w <br />� <br />J <br />= <br />= <br />== <br />Commitment - Intangibles & contribution to project success. <br />10- 1C1 <br />= <br />= <br />== <br />Personnel - Quality and dedication of project staff. <br />11- <br />0�j00 <br />=F_v_1I�i <br />Management - Leadership ability. <br />12 -f <br />v j0 <br />= <br />=1—J <br />Quality - Work performed correctly the first time. <br />Overall Performance Average: 4.0 <br />Documentation that supports this evaluation and Contractor's/ConsultanPs comments can be obtained by <br />contacting: <br />Duane Kopp at Phone# (305) 375-2111 <br />Evaluation Reviewed by: Supervisor 1`7 Division Chief r Assistant Director 1`7 Director 177 <br />The method of delivery of this evaluation to contractor /consultant: Certified Mail C EMail I?i Fax (- <br />Hand CG <br />City of Sunny Isles Beach 57 <br />Continuing ?roiessieral Services for Engineering <br />RFQ No. 11-07 -02 orssints�r�.:n[. <br />August 12. 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.