Laserfiche WebLink
Miguel Ortiz, MCE, P. E. / Structural Engineer <br />)ver 15 years of experience in the structural engineering field with <br />:cels at providing an efficient product that meets or exceeds the <br />linate and direct all phases of A/E projects based efforts while <br />Monte Real Development, Guayama, PR <br />• Retaining structure -Steel Soldier Piles. <br />• Maximum retaining height — 15 ft, Minimum soil <br />embedment -25 ft. <br />Villas de Las Flores, San Juan, PR <br />• Retaining structure- Steel Soldier Piles. <br />• Maximum retaining height — 11 ft, Minimum soil <br />embedment —18 ft. <br />Iglesia Stella Maris Basement, Condado, PR <br />• Retaining structure for two stories basement — Sheet <br />Piles <br />• Maximum retaining height — 20 ft, Minimum soil <br />embedment — 30 ft. <br />