Laserfiche WebLink
D:vmuv or N4.ARk ns,: Axn DcsEUtraEST ( HE SIAU, BnILa1.1G <br />BURE.n' of STATE F.%K.Em Mnnxur 1 43, SMITH CALnnn.': SMEET <br />i 1ggqt� <br />.95o/6r, 739a ,, .. tALLwH.USEE. I'WRIDd IZIJ¢6ISOL <br />.,9 iol Et7 iSF: FAX � r <br />FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES <br />ComSifissicispR ADAM H. PUTNAM <br />October 3. 2013 <br />I o whom it may Concern <br />My name is Craig Christ and I am a Construction Project Consultant employed by the Florida <br />Department of Agriculture and Consumer Services, located in Tallahassee, Florida. The purpose <br />of this letter is my recommendation of CPH, Inc.. 500 West Fulton, Street, Sanford. F1.32 771. 1 <br />have been a project manager for the State of Florida for I 9-years and in that time I have worked <br />with multiple design professionals in the state. From my experience- CPH Inc. is one of. if not <br />the best design firm I have worked with. <br />My relationship with CPH started in 2001 with the rash of hurricanes we experienced in 200-1 <br />and 2005. I work for the Division of Marketing. Bureau of Slate Farmers' Markets and we <br />sustained major damage at several of our properties. CPH was selected as the design firm for our <br />market located in Wauchula_ F un& which had sustained major damage. This project was <br />estimated at S45 million and included 2- replacement buildings I -major repair that replaced 'k <br />of an existing building and major repairs to 2 -other buildings on site. Not only did CPH perform <br />their duties flawlessly on this complex project, this was the smoothest reconstruction project we <br />undertook in the smmt men%e . CPII was also instrumental in our securing 100% funding from <br />FEMA for this project due to their damage assessments. analysis. written technical reports and <br />meetings with FEMA. In fact, they traveled to Orlando on Christmas Lve. 2006 bin meet with us <br />and FEMA uw finalize the scope of work and secure our funding. <br />I was so impressed with their performance on the Wauchula project that 1 have since contracted <br />with them for 6 other projects. These other projects have really run the gambit as far as scope of <br />work is cencemcd. We have used their services for such diverse projects as a communication <br />line relocation (which was a very complex project), partial demolition and addition pmjects, steel <br />platform repairs and they are currently working on a new retail sales building to be located at our <br />market in Ft. Pierce Florida. which also includes demolition - As you can see. I have worked <br />with CPH on quite a variety of projects from the straight - forward new building construc6un to <br />what can only be described a ­unusual- projects. The only commonality in the pmjects was the <br />performance of CPH. These projects ranged from S4- million- to 5100.000, but they were all <br />handled the same by CPH. I have found them to be professional, dedicated• asponsive and a <br />pleasure to work with_ They always return my calls the same day and have gone to the projects <br />on a moments notice when 1 needed them. I highly recommend CPFI, Inc. for all of your design <br />needs. regardless of size or scope of work. They have simply never let me down. <br />Should you have any questions. or wish to discuss my experience with CPH. Inc.. please don't <br />hesitate to contact me. I can be reached at (850) 617 -7389 or via email ( <br />Cm1e.Christ6bFm%h From Florida.com, <br />Si 1 ncerely. <br />Craig Christ <br />Construction Project Consultant II <br />50 CPH, Inc. /RFQ No. 14 -07 -02 <br />