Laserfiche WebLink
HANS MURZI, PE <br />development, GIS data acquisition and analysis, modeling, and development of the final report. The project area <br />® encompasses the complete Broward County with some portions of Dade County on the north and Palm Beach County on <br />the south. Scope of services included modification of MIKE SHE/MIKE 11 model for the entire Broward County with new <br />LIDAR based DEM and new Land Use data, calibration and verification of the model using known Hurricane storm events <br />by modifying Structure/Gate openings, Tidal boundaries and Boundary Conditions, simulating the calibrated model for <br />several design storm event scenarios and development of final report. <br />North New River Hydraulic modeling, 1-595 Corridor Improvements, Fort Lauderdale, Florida — FDOT District 4 <br />Project engineer assisting in the HEC -RAS modeling of the North New River Canal (NNRC). The NNRC Basin covers an <br />area of about 19,000 acres in eastern Broward County. The NNRC provides flood protection and drainage for the NNRC <br />Basin, and water supply to the basin during periods of low natural flow. The NNRC was modeled for the existing <br />conditions, and calibrated against historical storms, and then several scenarios were modeled to analyze different <br />alternatives to keep the channel capacity due to the SR-84 expansion that required filling of a portion of the channel. More <br />than 14 miles of channel were modeled in HEC -RAS. <br />1.595 Corridor Improvements, Fort Lauderdale, Florida — FDOT District 4 <br />Deputy Drainage Lead for the drainage design of 14 miles of corridor improvements. This project is a Public Private <br />Partnership between the Florida of Transportation and ACS Group. The construction value is $1.362 Billion and is <br />expected to be completed by summer 2014. The project covers 14 miles of roadway improvements along 1.595 and a <br />portion of Florida's Turnpike. The improvements include the addition of 3 reversible tolled express lanes, widening of the <br />six lane Interstate, reconstruction of the four lane divided arterial (SR -84), 68 bridge structures, and improvements to the <br />North New River Canal. Key design components include 8 braided ramp structures, directional connectors between the <br />express lanes and Florida's Turnpike and improvements to three major interchanges. <br />Development/Redevelopment Plan Conformance, Broward County, Florida — CBWCD <br />Project engineer for review of plats, paving and drainage plans, as -built drawings, and all drainage related reports for all <br />developments and redevelopments for conformance with the regulation, standards, procedures and design criteria of the <br />CBWCD. Processing an average of 70 plans annually, including Griffin Road Expansion; and the Turnpike Expressway <br />expansion from Johnson Street to 1 -595; CBWCD covers a 43.5- square -mile area that includes unincorporated Broward <br />® County Cooper City, the Seminole Indian Reservation; and communities of Davie, Hollywood, Sunrise, and Pembroke <br />Pines. Provided services related to regulation, permitting, infrastructure improvements, and the operation and maintenance <br />of more than 100 miles of secondary canals serving 150,000 residents. Participated in the annual revisions of the design <br />criteria manual and conducted site inspections. <br />Kissimmee Basin Hydrologic Assessment, Modeling, and Operations Planning, Florida — SFWMD <br />Project engineer for an assessment of how existing operating criteria for the water control structures in the Kissimmee <br />Basin can be modified to achieve a more acceptable balance among flood control, water supply, aquatic plant <br />management, and natural resource water management objectives, while also balancing impacts across ecosystems <br />including Lake Okeechobee and the estuaries. This project includes the implementation of an integrated surface-ground <br />water model (MIKE SHE/MIKE 11), use of screening tools like OASIS, application of Heuristic Wrappers, development of <br />performance measures, and development and application of performance measures evaluation tool. <br />Eastern C -11 Basin Facilities Report Update, Central Broward County, Florida — CBWCD <br />Lead modeler in facilities report update. Creating a 1500 -node XP -SWMM model to analyze the entire secondary canal <br />system in the Eastern C-11 Basin. The C -11 flows from west to east during flood conditions canal and is controlled at its <br />eastern border by Structure S -13, which separates the portion of the canal that is subject to tide. Stage - storage and <br />infiltration parameters were estimated based on GIS information. Flooding areas are to be identified and its flooding <br />problems alleviated through proposed control measures. <br />C6 Basin, Stormwater Management Master Planning, Miami, Florida — Miami - Dade County, DERMProject engineer <br />for development of a stormwater management master plan, which will identify the main water quantity and quality <br />problems and will implement strategies for reducing existing impacts. The plan will estimate the effects of existing and <br />future Ianduses on flood protection and water quality, and identify infrastructure and management strategies to <br />accommodate those uses. Assisted in the data collection, data manipulation, AutoCAD drawings, and GIS related tasks. <br />Department of Environmental Resources Management, Federal Emergency Management Agency DORM, Miami, Fl <br />Project engineer for drainage design of a 2- square -mile section of Miami's Westchester area. Project is funded by FEMA <br />due to major flooding in the area. Proposed drainage improvements include the design of exfiltrafion trenches to meet the <br />five -year stormwater quality criteria set by DERM. Performed design calculations, review of as -built drawings, prepared <br />® AutoCAD designs, cost estimates, reports, bid documents, and assembled packages. <br />WR.J.Behar <br />RFO No. 14-07-021 Page 13.31 <br />