|
MARLIN SCATTOLINI
<br />EDUCATION
<br />B. S. Civil Engineering, Florida International University, Miami, Florida, 2006
<br />YEARS OF EXPERIENCE YEARS WITH RJ BEHAR
<br />8 Years 2006 — Present
<br />OFFICE LOCATION: Pembroke Pines, Florida
<br />ENGINEERING EXPERIENCE
<br />At RJ Behar, Ms. Scattolini is in charge of design and plans preparation of roadway projects, drainage plans, signing and
<br />pavement marking plans, signalization plans, as well as permitting package. She has more than sic years of experience.
<br />RELEVANT EXPERIENCE
<br />SR-836 Auxiliary Lane and Interchange Improvements — Miami -Dade Expressway Authority (EAC Consulting, Inc.)
<br />Project Designer — The scope of this project is a SEIR study. RJ Behar is responsible for performing the typical section
<br />package, variance package, and drainage analyses for a 5 mile section of SR -836.
<br />SR-836 Emergency Access Ramp — Miami -Dade Expressway Authority
<br />Project Designer responsible for the roadway plans, traffic control plans, drainage analysis, utility coordination, lighting
<br />plans, signing and marking plans, structures (retaining walls) and special access gates. The project consists of an
<br />emergency ramp that connects the Florida Turnpike on -ramp to the SR 836 WB extension. Project length: 1 mile.
<br />Miami River Greenways, Segment D — City of Miami, Florida
<br />Designer — The project consists of the reconstruction of an existing roadway segment along the Miami River to produce a
<br />scenic, landscaped, pedestrianlbicyce walkwaylgreenway. The project includes the design of a drainage system with
<br />wells, decorative lighting and landscapethardscape design. Project length: 1 mile
<br />W. 291, Street 311 Safety Review (from Okeechobee Road to W. 4" Avenue) — City of Hialeah, Florida
<br />Project Designer for the design and production of roadway, drainage, signing and pavement marking plans. The scope of
<br />services consisted of a 3R Safety Review, which included crash data analysis and field observations to provide a report
<br />with recommendations to minimize the frequency of accidents. Project length: 1.5 miles
<br />Palm Avenue (from West 451, Street to West 49'" Street) City of Hialeah, Florida
<br />Project Designer for the design and production of roadway, drainage as well as signing and pavement marking plans. The
<br />scope of this project consisted of roadway improvements, milling and resurfacing, drainage, signing and pavement
<br />markings and lighting plans on Palm Avenue from West 451, Street to West 471, Street and from West 471, Street to West
<br />491, Street in the City of Hialeah. Project length: 0.25 miles.
<br />NW 71,191, Avenue Connector (Design) — City of Fort Lauderdale, Florida
<br />Project Designer — The project includes the roadway design of a 1.5 mile urban section, 4 -lane divided, connector
<br />between NW 71, and NW 91, Avenues in Downtown Fort Lauderdale. The scope of this project includes signalization,
<br />drainage design, signing pavement marking and permitting as well as public involvement coordination.
<br />SW 328"' Street from SW 152^" Avenue to SW 137"' Avenue — Miami -Dade County Public Works
<br />Designer responsible for the preparation of roadway, signing & pavement marking plans and drainage plans. The scope of
<br />the project included master planning and feasibility analysis for the new roadway. This project involved the upgrading of
<br />the existing traffic signals to mast -arms and internally illuminated signs. The design phase for this project comprised of
<br />drainage, lighting, signalization, signing and pavement markings.
<br />Hialeah High School Parking Garage - Civil Plans — City of Hialeah, Florida
<br />Project Designer for civil site improvements for this parking garage. Her responsibilities included the water, sewer and
<br />drainage layout, signing and pavement marking.
<br />E.10 Avenue, E. 470' Street, E. 481' Street - Reconstruction — City of Hialeah, Florida
<br />Project Designer for the design and production of roadway, drainage as well as signing and pavement marking plans
<br />E. 41' Avenue Improvements — City of Hialeah, Florida - LAPIARRA Project
<br />Field Services Engineer — Responsible for roadway, signing & pavement marking plans and milling and resurfacing. The
<br />project consists of extensive field work in order to locate roadway deficiencies over the project's 21 block span. Milling and
<br />resurfacing, ADA improvements, curb, driveway and sidewalk repairs, utility locations, and signing and pavement marking
<br />repairs were some of the aspects documented for this project. This was a FOOT Loral Agency Program (LAP) project.
<br />One of the challenges of this project was to prepare roadway plans which would improve the roadway corridor while
<br />J" A l
<br />).Behar
<br />RFQ No. 14 -07 -021 Page 13.36
<br />
|